A sustainable transit plan for Austin – outline and introduction

If this is sufficiently well-received I may fill in more later.

This post is in response to a request from Friends of Austin Neighborhoods, an organization of which I am a member, for some transit talk leading up to a position / plan from them. My key elements follow, in outline form, with links to old writing where feasible. I expressed my concerns that this would be a waste of time due to the alliance of FAN with AURA and Evolve Austin but was assured this was not an issue, so here we go.

Above all else, be skeptical of Capital Metro

Cap Metro’s record for honesty is bad and not improving. Lately, they mislead people about Connections 2025 (selling it as a “ridership over coverage” redesign, but in reality, it’s cutting service to our densest areas and rebalancing towards more suburban service). Under this we have details like conflating Rapid Bus with local service; using 1/2 mile or larger catchment zones when 1/4 mile is the industry standard, etc. Project Connect 1.0 was an unmitigated disaster due to a lack of honesty about constraints and aims by the people leading it, and they have never been held to account for it. We will not make any real progress for transit in Austin until these agencies act with transparency and honesty. FAN should demand better governance of, and leadership at, Capital Metro. My basic recommendation would be that board members need to at least ride transit sometimes and have a deep fundamental understanding of what actually raises and lowers transit ridership; and top leadership must be honest and ethical. Neither of those standards is met today by any board members or anyone in top leadership of the agency.

Background:

Watch the diversion of service dollars to the suburbs

Even AURA is on board with the Red Line being a bad investment, and I-35 BRT being a horrible idea. But that’s not where it ends.

The service just introduced for Round Rock is a horrible deal. Cap Metro is being misleading about it being a “contracted service”. Round Rock doesn’t pay overhead that supports Cap Metro’s structure in general, and their passengers can continue onto mainline routes despite not having paid taxes to support them. They’re getting a sweetheart deal in return for not paying into the system. This is bad for Austin.

Likewise, park and rides placed near the edge of the city limits or the edge of the service area are obviously going to tend to attract patrons from jurisdictions that don’t pay to support the agency. While you might want to supply them with transit anyways, this is a zero-sum game or worse. Every $25 operating subsidy paid so somebody from Cedar Park can ride the train despite not paying taxes to support it results in 5-10 Austinites not getting to ride a bus that their city did pay taxes to support.

We should not be subsidizing the suburbs’ road network and also subsidizing their transit. If we don’t get to cut one, cutting the other is not only good but necessary. Again, in Austin, transit is a zero-sum game; we have no ability to increase operating funds, so every dollar we blow on somebody in Cedar Park is taken away from a prospective rider in Austin. Friends of Austin Neighborhoods should be about supporting Austin’s interests first against so-called predatory regionalism.

Background:

Specifically watch for land use claims that fall apart under scrutiny

In 2014, I made this warning about Rapid Bus: Rapid Bus Has Degraded Bus Service.

We were told continuously by people more credulous than I that Rapid Bus was a great deal. I went to a lot of trouble to show that its benefits accrue disproportionately to those who live the furthest out, while those who live close in suffered service degradation.

The Panglosses kept at it, assuring us that infill stops would be added any day now. It’s now looking like 2018 or later for two infill stops, and even with those infill stops, Hyde Park will still have worse service than it did in 2011. Connections 2025 will make it even worse than that!

Rapid Bus is also a suburban subsidy although it’s more of a subsidy to the worst land use INSIDE Austin (i.e. low-density sprawl inside far north and far south Austin gets better service now, by speed, than does Hyde Park). AURA hasn’t opposed Rapid Bus primarily because their president lives close to an 803 stop and saw personal benefit from the service change that screwed thousands of others. I think FAN needs to be more honest and transparent than that, and hope you agree.

Watch out for things that don’t pass the BS test

Don’t ask a transit rider if the grid redesign’s requirement to add transfers will increase or reduce ridership. They have no idea; they’re already riding. Ask somebody who has a long history of being right about service changes’ impact on ridership. Ask somebody who is transit-positive but has to drive to work.

The fact is that the Connections 2025 redesign cuts local service even further for the areas of Austin with some of the highest modeshare, and yet, Evolve Austin and AURA have bought into the Big Lie from Capital Metro. I shouldn’t have to keep explaining this, but in 2011, you could pick up a #1 on Guadalupe in Hyde Park every 10-12 minutes during peak and a #101 every 20 minutes or so. Now there is a local every 30 minutes, and the distance to walk to ‘rapid’ (fancy 101) is too long to make up for the increased frequency. Actual riders are worse off today; and yet Connections 2025 proposed making that even worse under the guise of improving things. (Eliminating local service on Speedway, and originally proposing eliminating the remaining locals on Guadalupe too!)

Friends of Austin Neighborhoods generally promotes urbanist ideals. Having a transit agency which cuts service to the areas that buy into urbanism inevitably leads to pushback in the future for land-use changes as people become justifiably skeptical that new residents of infill developments will use transit at non-trivial levels.

If you say you want ridership over coverage, be serious about it

Ridership, ridership, ridership. This is a public investment; we need our transit dollar to go as far as it possibly can.

That’s all the time I can spend now. Let’s see if FAN was serious about taking this seriously before I invest any more.

Evolve Austin continues AURA line of horseshit about transit and density


Dear mayor and council members:

My name is Mike Dahmus; I served on the Urban Transportation Commission from 2000-2005, and have written a bit on the topic of transportation (mostly transit) ever since.

You've received some correspondence recently on and on behalf of Evolve Austin that continues to claim that Capital Metro is reorienting its services to better support land use that provides the density and walkability to make transit service more feasible and sustainable at a lower cost.

This is false. Cap Metro has not changed one iota; the recent service changes continue a pattern of reorienting service to unproductive suburban areas and away from the areas that produce the highest transit ridership (and have the highest potential for additional ridership).

This presentation, from 2015, explains why the Rapid Bus shift was a degradation of transit service. Connections 2025 doubles down on this shift, removing even more local walkable transit service from the core neighborhoods where it is most heavily used.

https://www.slideshare.net/mikedahmus/20150211-transitvslanduse

I'm eager to communicate via email if any of you have any questions.

Regards,
Mike Dahmus
mike@dahmus.org

In the year 2000

of course, treatment the humans are dead.

humansaredead1

In the year 2008, information pills the following files represent the main local and express bus services on Guadalupe (thanks to the Wayback Machine):

Route 1 in 2008

Route 3 in 2008

Route 5 in 2008

Route 101 in 2008

Look in a little more detail during the AM peak, with relevant images.

Route 1:

route1_sb_peak

At the Guadalupe/45th timepoint, there were 21 trips passing by after 6 AM and before 10 AM (headway was 11 minutes). Applies to NUNA and Hyde Park. Stops every couple of blocks, so assume a short walk straight west to Guadalupe.

Route 3:

(In 2008, the Route 3 ran down Guadalupe from 38th to 29th, and then jogged through West Campus a block or so to the west).

route3_sb_peak

(Assuming that 34th/Guadalupe is about halfway in between the 38th/Lamar and MLK/Nueces timepoints):

At 34th/Guadalupe, there were 11 trips passing by after 6 AM and before 10 AM (headway was 21 minutes). Applies to NUNA only, not Hyde Park1. Stops every couple of blocks, so assume a short walk straight west to Guadalupe.

Route 5:

(Ran/runs across 45th to Speedway, turns right and heads through center of Hyde Park and NUNA, then west to Guadalupe at north edge of UT).

route5_sb_peak

At 38th/Speedway, there were 9 trips passing by after 6 AM and before 10 AM (headway varied from 15 to 30 minutes). Stops every couple of blocks along Speedway so you can assume a mostly direct, short, walk.

(Why not include the IF?)

The IF runs basically the same route as the 5, from 45th to UT. However, it is not suitable for use by the general non-UT population. It doesn’t go south of UT to downtown; it doesn’t run on non-class days; it doesn’t run during breaks when normal people have to work. At best it’s an emergency backup.

(Why not include the 19?)

I might should. When I did this wayback exercise I wasn’t thinking of it, but the 19 was somewhat useful south of 38th, if I remember correctly. I might go back and correct if enough people clamor for it.

(Why not include the 21/22)

Very short segment on Guadalupe, not generally north-south in ways that would be useful for this exercise.

Route 101:

(Ran on essentially the same route the 801 runs today, hitting most of the same stops – not all. Stop at 51st instead of the Triangle; stop near 38th served NUNA a little better and Hyde Park a little worse than current 801 stop closer to 39th. Note that no other stops are served than the few dots on the map in the PDF linked above. So it’s 51st, 38th, and then UT.).

route101_sb_peak

At 38th/Guadalupe, there were 7 trips passing by after 6 AM and before 10 AM (headway was 15 minutes but only started at about 7:30 and ended at about 9:00). Counting for both NUNA and Hyde Park as this was the designated ‘express’ for both (no closer option), and we’ll do the same later for the 801, but indicated as ‘long walk’ in both cases.

2008 Summary

For a resident of western Hyde Park, you could walk to Guadalupe and expect a route 1 every 11 minutes, a route 101 every 15 minutes (unless very early or very late), and you could walk east to Speedway and expect a route 5 every 15-30 minutes. Total local buses for southbound peak available: 30. Total limited-stop buses for southbound peak available: 7 (long walk for some).

For a resident of NUNA, you could walk to Guadalupe and expect a route 1 every 11 minutes, a route 3 every 21 minutes, a route 101 every 15 minutes (same caveat as above), or you could walk to Speedway and expect a route 5 every 15-30 minutes. Total local buses for southbound peak available: 41. Total limited-stop buses for southbound peak available: 7 (long walk for some).


  1. although if I was the kind of anti-CapMetro pedant most assume, I’d give full credit for Hyde Park since the southwestern corner could easily walk to 38th/Guadalupe and pick up the 3. But I’m better than they are, so I won’t give credit for HP for these locals 

#atxrail classic courtesy of Central Austin CDC

The insiders who messed up Proposition 1 still haven’t come to terms with what they did, so I’m not going to let it sit either. Here’s something not to forget; when certain political actors try to pretend there was some kind of consensus behind the choice that got spanked at the polls instead of the one that was never allowed to be studied:

https://twitter.com/cdcatx/status/585817756165021696/

atxrail1

Where did the Highland alignment come from?

I don’t claim to know Leffingwell’s motivation, what is ed but everything else in this short post from Dave Dobbs via twitlonger is accurate:

“Austin’s Proposition One is a poison pill for democracy and the new 10-1 council.

My view is that when Mayor Leffingwell found himself on the losing end of the 10-1 vote, page he decided to make his prediction that such a council so constituted couldn’t function by saddling that future council with enormous debt and a totally non sequitur urban rail plan that doesn’t go where most people go, symptoms doesn’t address congestion, has far too few riders for far too much cost, will see too little fare box return and that will negatively impact bus service. Additionally, the convoluted rail ballot language politically encumbers the new council with certificates of obligation (CO) for $400 million in roads that will do nothing for Austinites, while at the same time authorizing bonds for a rail proposal that the FTA is not likely to put high on the list. And because Austin changed the original destination from Mueller to Highland ACC, another three years of federal planning (and more money) will be necessary to even get on the list for federal funding.

The bottom line here is that if Austin’s Proposition 1 passes, a new council, awash with voter mandated debt, will have it’s hands tied; subject to the charge that it’s not carrying out the voter’s wishes if it doesn’t spend the money. In short, passage of the rail bonds and the problematic road CO’s associated with those bonds is going to create endless static in council chambers for years. How can anything productive come out of that?”

Dave Dobbs,
Texas Association for Public Transportation

A short interlude from the “urbanists, search seriously, the rail election is important” thread:

As somebody who was involved in the Project Connect Phase 1 process, I can tell you that the inclusion of Highland as a high-scoring choice for the final projects to move forward into Phase 1 was a complete surprise to all of us. Highland is an awful segment of the route. It only works if you ignore every bit of good advice about how to build urban rail – it assumes park-and-rides on the highway for suburbanites are how we fill trains for an urban service. Nobody who was involved in Project Connect Phase 1 liked Highland.

Except, apparently, the Chamber of Commerce.

I’ve made the case lately that the Highland alignment was flat-out chosen for us BY the Chamber of Commerce, based on circumstantial evidence (what other reason could there be?) – and please don’t quote me Project Connect statistics; that entire process was a complete joke. It’s certainly not a good choice on transit grounds (see “urban rail should be urban” series underway at another great blog – CarFree Austin). But when I’ve suggested that the Chamber picked this line, I’ve been attacked by people at the Chamber and told it’s nonsense.

Huh.

Then I got an anonymous tip.

I wonder if you guys would like to see a video.

This is an excerpt from Citizens Communications from 6/13/2014 at the CCAG meeting. The speaker is Beth Ann Ray from the Chamber of Commerce. The full video of the meeting is here at the City, I suggest you click on “Item 5” on the right and then advance to about 15:30.

Transcript of this section, by me:

based on our input, from Project Connect, and the meetings and workshops that we have had with the project staff, you have an LPA that our committee (our transportation committee) selected actually, way back in the beginning in the first workshop we did, and a few weeks ago, that same committtee recommended to our board that they consider supporting the entire LPA from Grove all the way up to ACC’s flagship campus up at Highland redevelopment

Let’s look at that transcript again, with some added emphasis:

based on our input, from Project Connect, and the meetings and workshops that we have had with the project staff, you have an LPA that our committee (our transportation committee) selected actually, way back in the beginning in the first workshop we did, and a few weeks ago, that same committtee recommended to our board that they consider supporting the entire LPA from Grove all the way up to ACC’s flagship campus up at Highland redevelopment

Hmmm. I suppose it’s just a coincidence that nobody except the Chamber liked Highland, and Highland ended up being picked, right?

Rapid Bus has degraded bus service overall

This VMU on Lamar at North Loop (google maps link; as of 9/5/2014 the streetview picture is from construction) is open now. I like it. It has a bus stop right in front of it! Streetscape is good. There’s actually a new Taco Cabana across North Loop from it, unfortunately with a drive-thru, where the pretty image to the right has a grassy field1. The property to the south of the Taco Cabana appears ripe for redevelopment soon as another VMU; I’d be surprised not to see it go that way within a couple of years.

052512_wheatsville_1479950a

Let’s imagine the resident of one of these new apartments wants to take the bus to Wheatsville Co-Op, an urban grocer located at about 31st and Guadalupe. Lots of people used to ride the bus to Wheatsville last I checked.

For background, the VMU ordinance was enacted as a quid-pro-quo for the McMansion ordinance – the logic was that we would build tall apartments (for Austin, anyways) over walkable retail on corridors where transit frequencies and usefulness was high. Lamar/Guadalupe definitely fit that bill, at least originally.

Before the implementation of “Rapid Bus”, the #1 ran about every 13 minutes during peak periods on this route. Google maps says that the bus portion of this trip takes 8 minutes on the #1. Note that Google doesn’t even consider the 801 a viable option for this trip, unlike Capital Metro themselves. We’ll get to that in a minute.

We can use the same “show up and go” calculations from this post to come up with this graph. Short summary: If transit service is to be truly useful as a replacement for the car, it needs to be frequent enough that you don’t bother to check a schedule; you just show up at the stop and a bus comes pretty soon (and by the way this was one of the big marketing points for the #801; so this isn’t just a condition I’m placing on them to be mean). Note that the walking time on either end for the #1 trip is essentially zero – there are bus stops for the #1 (but not the #801) directly in front of the VMU building and the grocer.

Originally, when frequency was every 13 minutes, a trip to the grocery store would involve a 0 minute walk, an average 6.5 minute wait (half of frequency), and a 8 minute trip on the bus, for an expected trip time of 14.5 minutes. Not bad.

However, in the world we live in now, Capital Metro has cut half of the #1s and imposed instead the #801 in place of the #101, stealing the local frequency for the express. How does that service work for our apartment resident?

Same calculations as above – we end up with an expected wait of 13 minutes (it runs every 26 minutes during peak)2. Total trip time is now 21 minutes, if you can get a seat on this bus, which has been a problem ever since the 801 change happened.

But surely the 801 made up for this drop in service, right?

Again, Google won’t even give this as a trip; but Capital Metro’s trip planner does.

20140905capmetrotripplanner1

Huh. Cap Metro expects the user of this ‘service’ to walk about a half mile north to the “Brentwood Station”, wait (12 minute frequencies during peak), ride the bus to the “Hyde Park Station” (7 minutes), then walk about a half mile south to Wheatsville. Hey Google, how long will those walks take? Google says 8 minutes each, roughly.

So let’s graph those new trips, shall we?

20140905stackchart

The results show that, and all of this is compared to the conditions before the #801 started (“old #1” in the graph), a resident of this apartment building can now either pay the same amount of money for a much less frequent service (#1) that will now take about 50% longer to get where they want to go, or they can pay double the price for a reasonably frequent service (#801) that will take more than twice as long to go where they want to go. People boarding a bus at this stop and travelling to Wheatsville have seen a significant degradation in quality of bus service.

What’s the conclusion? Well, even if you are foolish enough to think a 26 minute frequency local service still qualifies as “show up and go”, the residents of this VMU and many others in the area are unquestionably much worse off after the implementation of MetroRapid. And what’s worse – the developments resulting from the VMU ordinance were sold to surrounding neighborhoods as less of an impact on their daily lives because we all assumed many of its residents would ride the bus.

Still true? Doubt it.

More to come.


  1. Chris Bradford bait 

  2. most people would not consider this “frequent” and thus probably wouldn’t even consider the ‘show up and go’ approach, but let’s keep going 

Project Connect Phase 1 Lie Number 2

“We can’t ask the Federal government to fund urban rail on Lamar/Guadalupe because they already paid for Rapid Bus, and they told us they wouldn’t pay for it, and would instead demand all the BRT money back” or variations of same.

This one has legs. I even believed it myself to an extent, once. It’s a little complicated, because nobody at the FTA is truly going to go on the record, but there’s a couple of angles here that are clearly about Project Connect misleading the public (i.e. misinforming; even lying).

In 2004, though, the project was originally marketed to voters as a “possible placeholder for future urban rail”. Unfortunately, this was before I learned I needed to save images of anything put up by Capital Metro, so you’re going to have to trust my memory on this one. Suffice to say I didn’t find it compelling back then as I believed this was an attempt to get central Austin voters to support the plan but that Capital Metro had no interest in actually following through with the “first rapid bus, then rail” angle. They took down that language right after the election, by the way.

Fast forward, then, to Project Connect in 2012.

The first angle – was it ever on the table?

At the beginning of the Project Connect process, we were told that Lamar/Guadalupe was on the table and would be fairly evaluated. We were also told for years, in no uncertain terms, that Rapid Bus should not be stopped because it was not an obstacle to urban rail there. Now, granted, I didn’t always believe this myself – note that in this very blog, back in 2006, I approvingly linked to a Statesman article about Leffingwell and McCracken halting (for a time!) Rapid Bus because they correctly determined that wasting our best rail corridor on buses no better than current #101 service was incredibly stupid.

Capital Metro and Project Connect employees went to great pains to tell people (in person) that Lamar/Guadalupe was not precluded from the urban rail corridor selection process by the presence of Rapid Bus. This is the only reason I bothered to get involved with the process! People like Jace Deloney were told by people like John-Michael Vincent Cortez that there was no obstacle to Guadalupe getting trains on it. Cortez spent the better part of an hour dissembling at an Urban Transportation Commission meeting to Deloney’s questions about Rapid Bus – saying variants of “well, we could put urban rail there, but why would you ever want to, because Rapid Bus is going to be so great”.

Put a pin in this – we’ll get back to this later.

Project Connect Phase 1 went through their ridiculous, contrived, process which was obviously designed to produce justification for the predetermined rail route to Hancock. I think most of us have finally settled on that characterization by now. But one of the most irritating things, at least to Project Connect, about this process was their failure to convince the public to abandon the Guadalupe corridor as their #1, by far, choice. Despite the flawed (on purpose) design of the study; despite all the shenanigans, people still preferred Guadalupe by large margins to either of the corridors Project Connect wanted them to prefer. People still weren’t choosing the corridors Project Connect had been designed to get them to prefer! Those ungrateful wretches!

So at the very end of the phase, Project Connect and their lapdogs  went on a full-court press to explain to people why, despite massive continuing public preference, we would not be studying Lamar/Guadalupe in Phase 2. The claim was made that they had back-channel correspondence with the FTA that indicated they would not look kindly on ripping out MetroRapid right as it was starting just to put in urban rail. Which is where we get to the next angle. But first:

This is where I really got pissed off.

A lot of people spent a lot of time on the premise that our best rail corridor was, in fact, on the table. I took time away from my job and my family to do so. Many others took much more time away from their jobs and their personal lives. So it’s incumbent on Project Connect to tell us why they lied at the beginning, or why they’re lying now, because it has to be one or the other. Either Guadalupe was on the table, in which case they lied at the end; or it was never on the table, in which case they lied at the beginning. We are owed an explanation for this. I explained that last bit in a note I sent over my Thanksgiving holiday, for god’s sake, and nobody ever even attempted to resolve this at Project Connect or at the CCAG.

The second angle – did they even ask the FTA the right question?

Any urban rail project won’t be tearing up streets right away, even if it passes in November of 2014. The first time you’d see jackhammers and bulldozers would be at least 3 or 4 years further down the road – so let’s say 2017. Additionally, as pointed out by numerous people on both sides of the issue, the proposed alternative urban rail alignment (starter) for Lamar/Guadalupe only overlaps the middle quarter or third of the Rapid Bus alignment. Finally, nobody proposed eliminating Rapid Bus immediately, although I think we can all agree that running buses like that through a construction zone on the Drag would really suck. Slightly worse than running them through normal Drag traffic!

So did they ask the FTA “What would you do if we started upgrading the middle part of the Rapid Bus corridor to urban rail in 2017 or 2018?”

Nope. According to their public statements, they asked the FTA “How about if we immediately stop Rapid Bus1 and start working on urban rail here. How would you guys feel about that?”

Of COURSE the FTA said “you’d have to pay us back our Rapid Bus money”. To that question, why would you expect anything else? But even if we had to pay back the Rapid Bus money, it’s still peanuts compared to how much money we’re going to spend on Urban Rail, both Federal and local.

To equate “Can we just immediately stop Rapid Bus right now” with “Would you mind if we started upgrading the middle part of the corridor 3 or 4 years after service begins, probably continuing to run Rapid Bus as-is on the north and south ends of the corridor” is disingenuous. Misleading. Dishonest. Some might even say – a lie. To say nothing of the fact that during this phase of planning, we’re supposed to be talking about ‘corridors’, not ‘streets’; and some people like “OurRail” are proposing running urban rail a block off the Drag anyways, further reducing the area of supposed conflict to just a mile or two.

Finally, we heard from the guy at Capital Metro who planned the whole Rapid Bus project. Surely he’d set all of the Lamar/Guadalupe partisans right. Surely he’d line up with the fine leaders of the political machine on this one. Right?

The third angle: The guy in charge of Rapid Bus planning

I watched a CCAG meeting where Surinder Marwah spoke, and have been on a lot of email threads where he was CC’ed. He responded in onethread to a question by me of whether John Langmore had ever been forced to explain why the Rapid Bus project manager would support rail on Guadalupe (this is an edit from early versions of this post – I missed it the first time around). His response had a bunch of good technical detail about the FTA, useful life of bus projects, the definition of “permanence”, etc. which I’d have to go seek permission to repost.

However, Lyndon Henry has already done the legwork on this one. From an article in Railway Age:

Indeed, Surinder Marwah — the Capital Metro planner who originally designed the MetroRapid project and helped secure FTA Small Starts funding — corroborates MetroRapid’s role as a precursor to urban rail, and disputes that the project was ever intended to block rail in the G-L corridor. Marwah ranks as a strong and knowledgeable advocate of urban rail in the corridor.

Oops. Well, surely the FTA itself can be trusted to back up the leaders of our local political machine?

The fourth angle: The FTA’s Actual Public Response

Posted by the Central Austin CDC and others, this is the actual content of the response from the FTA to requests for information about this issue:

20131212ftalettertocapmetro

What the FTA says here is that they would consider funding urban rail in this corridor as if it was any other corridor; but they might want some of the BRT money back (because, of course, they were asked the wrong question – listed above).

Even when asked a leading question implying a complete abandonment of the “BRT” investment, the FTA said they’d still be willing to fund urban rail in this corridor. They didn’t promise they would; but for the leaders of our political machine to characterize this, as they have, as “the FTA won’t pay for urban rail there because they already paid for Rapid Bus there” is a LIE.

pantsonfire-animated

That’s all the time I have for now. Look for edits as I get more.

 Further reading


  1. two months BEFORE the buses were to start running 

Project Connect Phase 1 Lie Number 1

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.
if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, apoplexy I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.
Lie #1 during Phase 1 of Project Connect was the justification of the collapsing of the West Campus and UT “subcorridors” (zones) into the Core subcorridor/zone “so we could ensure they would both be served by any initial alignment”.

At the time, cheapest on November 1st, see I made this post, which asserted that there was no way this decision was being made to ‘serve’ West Campus; that, in fact, it was being made to avoid having to serve West Campus (which would obviously imply a route on Guadalupe).

Now, the final alignment through campus has been decided. Let’s see what we got. Click on most of these to make them bigger.

From Project Connect’s presentation to the CCAG on Friday February 21st:

20140221_PC_Campus_Area

Huh. Look at that. Not only do we not even see West Campus, but we can’t even see the western half OF campus. What a shock!

But it’s probably just a misleading image, right? There’s no way Project Connect would have told everybody they were going to serve West Campus and then not do so – West Campus must be just right underneath the words on the left, right?

Let’s see how far away a couple points on San Jacinto are from a location two blocks west of Guadalupe, using Google Earth. (The center of density in West Campus is not on Guadalupe – the best height entitlements are actually several blocks to the west. A ‘population center’ of West Campus in a few years will likely be 3 or 4 blocks west of Guadalupe; so me using 2 blocks is being generous to Project Connect).

Remember that the rule of thumb in transit planning for years has been that most people will not regularly walk more than a quarter of a mile from their home to their transit stop (or from their transit stop to their office). A few will do more, but the quarter-mile rule ensures you will get most of your possible transit market. Some people lately have tried to assert that good rail transit can do the same thing with a half-mile walking radius; in my opinion, this works in some cities where parking is quite difficult, but primarily on the home end of the trip, not the office end.

First, from 21st and San Jacinto to two blocks west of Guadalupe on 21st:

20140221_21SJ_TO_WC

 

0.6 miles. The main density of West Campus is definitely not served by San Jacinto even by the most generous standard. Guadalupe itself is 0.48 miles away; served only barely by the most generous standard. In other words, the side of campus with the most activity is well outside the commonly accepted walking radius and just barely inside the most generous one.

Now let’s try 24th.

20140221_24SJ_TO_WC

 

0.58 miles to where West Campus’ density starts. West Campus is not served at all by a stop here, either.

Finally, Dean Keeton and San Jacinto:

20140221_DKSJ_TO_WC

 

 

 

Nope. 0.54 miles to the start of West Campus’ density. To the start. Still outside even the most generous reading of “served”.

Project Connect, the claim of yours made back in November is still a lie.

Lie-stamp

MetroRapid: What you REALLY need to know

[evp_embed_video url=”http://dahmus.org/20131115ccagcomment.mp4″]
to which I do not know how much energy I shall devote as it appears to be oriented towards an effort to get buy-in from the more general public who doesn’t even understand transit rather than correcting their horrible process so far. But consider this a cry for reinforcements, store and an argument against civility at the expense of policy. I don’t know if I’ll even be involved this time.

Tonight SHOULD be about the citizens of Austin telling the planners that you see through this bullshit exercise in expensive obfuscation that the machinery of the city1 and Capital Metro2 have collectively foisted on you to try to make previous plans look less stupid. It SHOULD be impossible for the ringleaders to successfully pull off a propaganda coup. But are enough of you going to be willing to fight; to be uncivil?

Tin-Foil-Cat-Hat-1

Me, right now, I’m rapidly becoming disillusioned about the prospects of anything improving life in Austin as even most of the people on ‘my side’ of the rail debate in Austin continue to be more interested in staying friends with the gladhanding jackasses who got us to this point than doing the right thing3 . Yes, there are still far too many people who think JMVC is their buddy; who trust the lying smile from the guy paid to mislead you more than the asshole who tells the truth, because the paid misleader shakes your hand once a week and is at all the right meetings and all the right events, while the asshole is just an unpaid hobbyist you mostly hear from on the internet who can’t devote significant time to the meetingocracy as he continues to fail to find a job downtown4 and must, therefore, ‘participate’ almost exclusively electronically from his desk near godawful Westlake High.5 There are still far too many people who won’t go out on a limb in public beyond modestly suggesting ‘this is slightly less than optimal’ while thanking the people who produced the misleading propaganda for their hard work; and then attack the manners of those like me who keep wanting to point out the Emperor’s bare ass. And there are still far too many theoretically pro-transit people who will line up behind an unquestionably bad policy decision because they think it’s good politics.

thanks

Why thank Project Connect for all their hard work when it was done in the service of a transparently obviously rigged process designed to subvert good planning and the will of the people? If you’re a Democrat, do you go thank George Bush’s staff for working so hard to help him achieve his goals, when you disagree with both the goal and the method? I’m struggling to find better analogies but I find this incomprehensible – lots of people do hard work for bad actors; do they really deserve our THANKS in the process? When they KNOW they’re doing bad work and misleading people? (This is not an opinion, people; there’s no other rational explanation for some of PC’s whoppers. When the reaction of people who watch transit planning all over the country is “#WhatASham” or “I’m going to use this as an example of bad transit planning forever”, does anybody honestly expect thanks?)

That being said, it brings up an interesting parallel – there were many people in Congress who worked to pass Obamacare knowing it was the politically wrong thing to do but it was the right thing for the country. Many of these people were warned it might serve as the end of their political career. It certainly burned up all of Obama’s political capital.

As I recall, though, more than one was uncharacteristically honest about it – “if not for this, then why are we here?” at least one said. Why bother to accumulate the political power if it only leads to attempting to maintain or enhance said power, instead of doing the things that you were sent to do? Doesn’t mean you die on every hill; but if you’re not willing to die on ANY hill, why are you even there?

mr_smith_goes_to_washington_61073-1920x1200
“But what if people are embarassed? Never mind; I’d better just sit down and play along.”

The same is true here. What good is it to remain friends with the consultantocracy and the gladhanding jackasses if, at the end, the big payoff is a rail line to Highlandmueller with 8,000 boardings/day, and it’s 2040 before we can start to have another rail conversation?

Waiting for urban rail on the corridor that makes sense
Waiting for urban rail on the corridor that makes sense

If you’re falling in line because it’s good politics, in what world do you think we get to build a second urban rail line before those of us my age are dead, when the first line has 8,000 boardings a day? When we need somewhere in the low 20,000s to be considered a moderate success worth building off of?

Was the Red Line worth this very same compromise, which so many took in 2004 and urged me to take? I’d argue you’d be an idiot to think so today, but in fact, many still think so, despite the fact that it’s reached its ceiling at a whopping 2000 boardings/day; despite the fact that its monstrously high operating subsidies to mostly non-Austinites from mostly non-taxpaying cities have led to cuts in bus service for the people who pay >90% of Capital Metro’s bills. How was that a good policy decision, if it didn’t lead to another serious rail conversation until 2014; and if even then, we can’t have an honest POLICY decision about the next rail line – we still have to play idiot politics so certain people don’t look stupid about overselling the reality of Rapid Bus or Mueller? And how can those people think they made the right decision back in 2004? Hell if I know; I’m just a guy who can spend an hour every other week on this, but it sure seems obvious to me. Why is this so goddamn hard?

After I gave my short speech at the CCAG, I was actually lectured by a well-connected insider / former neighbor; and then later by a UT VP; that the fault for any lack of rail on Guadalupe/Lamar is mine, presumably for daring to continue to have contrary opinions on this and voicing them publically, which is Bad Form, instead of swallowing my objections and joining the meetingocracy.6 That it’s my fault that they have not been convinced – or in another sense, that the job in Westlake; raising three kids; trying to keep a company afloat and a couple of teams from being laid off; that these are all not valuable things to these people; and thus their inability to be convinced of what every transit professional from around the country finds inherently obvious is my fault because I haven’t quit those other responsibilities and spent months producing essentially the same research other allies already have only to have it ignored in favor of the continuous examples of ‘mistakes’, other faulty data and the rigged analysis produced by full-time people being paid to mislead the public.

Pictured: Project Connect
Pictured: Project Connect

I don’t have much more energy for this; and I’m not optimistic. At the end of this, I expect most of my putative allies on the G/L side to say “well, we tried” and go back to the consultantocracy, welcomed with open arms because they didn’t fight too hard.

Fuck that. Either fight hard or sell out; but don’t tell me you’re doing the first when you’re really doing the second. And you can’t fight at this point by staying friends with Project Connect; they are now the enemy. The place we have to win now is the City Council, because the CCAG has already made up their minds, and if we don’t get the City Council to FORCE them to change, it’s a done deal for Highlandmueller. This is going to require fighting to various degrees – Project Connect is a lost cause. If you could convince me of a rational path which includes “continuing to treat Project Connect like rational actors who are doing a good job and not trying to mislead people” and ends with victory, you’d have done so by now.

Your pal,
M1EK
Back when I thought the order was communications, migraine THEN decision; the speech I was going to give in outline form:

  • Introduce self, name, AURA supporter, UTC, blog
  • Mention letter from AURA & agree with points but here to talk about…
  • Is Rapid Bus really an impediment to rail on Lamar?
  • KK says so sometimes in public
  • AURA and others trusted claims made by staff of Cap Metro and Proj Connect that everything was on the table
  • Why shouldn’t rapid bus be in the way?
  • Others have made points: Depreciation, timeframe, movable ‘investment’
  • Mine based on QUALITY of improvement – all points apply only to 801 north of river
    • If you ride a 101 today:
      • No faster
      • More expensive
      • Couple more trips per hour (shift from local to express)
    • If you ride a 1 today:
      • Lose half frequency or have to walk much further & likely pay more
    • You may gain: GPS (next bus). Not that useful considering argument in favor of MR is that you won’t care about the schedule.
  • NOT BRT – refer to ITDP standards and Jace’s scoring; not even close.
  • Circle back – used Cap Metro’s OWN DATA which trumps marketing / soft features
  • Just today? Linda Watson called it “Austin’s densest corridor”.
  • Conclude

A comment I posted to this PR fluff piece by Movability:

What you need to know is that this REDUCES frequency for current 1/101 riders north of the river, more about because the 1L is being eliminated along with the 101. If you’re boarding at a stop served by both the 1 and 101 today, bronchi the same total number of 1 and 801 buses will stop there in the future; the mix will just change to fewer 1s. If you’re boarding at a stop served only by the 1L/1M today, you’re going to lose half your buses.

What you need to know is that this was projected to be no faster than the 101 in early plans, and now data sent to google maps actually shows it being slower than the 101 (not sure if this is legitimate or a hiccup, but it’s not a good sign).

And finally, what you need to know is that this will cost riders a lot more to ride. Despite the fact that the 1 route was quite likely the least subsidized bus route in the city before this change, fares are going up due to this change (the 801 will cost quite a bit more than the 1 did).


  1. curiously, not city council itself, which has been to this point almost completely uninvolved in this process beyond the Mayor; see the end of the post for more 

  2. somewhat likewise as with the city, although their leadership is a little more bought-in to this than the city’s is 

  3. some will chide me that I give people like this guy way too much importance; that they aren’t decision-makers. True in a sense; but they are constantly in the ears of the decision-makers, and constantly in the ears of the media (except for one or two notable exceptions, and in one case, he’s actually convinced everybody on the pro-transit side that the media member was the problem to the point where I’m pretty sure I’m the only rail advocate who will even talk to the guy). Or they may say that nothing is served by fighting guys like that, but I firmly disagree; because NOT fighting guys like that gives him his power, which he then uses to co-opt you into providing legitimacy for this illegitimate process that will produce the predestined result. I say wait until this gladhanding jackass in question has convinced some members of the media and some council staff that you’re a troll before you judge me for caring about this too much. 

  4. note: it would have been a lot easier to do this if we had GOOD rail heading downtown and it wasn’t so ridiculous for non-single-website heavier-duty software companies to locate there 

  5. yes, this is part of the reason for the bile. God, I hate Westlake so much. 

  6. these are people who actually believe, or profess to believe, that you get rail on Guadalupe right after you build a massive failure to Highlandmueller; and thus if you push too hard now you’ll not get rail on Guadalupe, which is ridiculous as rail on Highlandmueller, guaranteed failure that it is, assures we won’t see rail on Guadalupe/Lamar until I’m long dead 

Great responses to John Langmore

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.
if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, apoplexy I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.
Lie #1 during Phase 1 of Project Connect was the justification of the collapsing of the West Campus and UT “subcorridors” (zones) into the Core subcorridor/zone “so we could ensure they would both be served by any initial alignment”.

At the time, cheapest on November 1st, see I made this post, which asserted that there was no way this decision was being made to ‘serve’ West Campus; that, in fact, it was being made to avoid having to serve West Campus (which would obviously imply a route on Guadalupe).

Now, the final alignment through campus has been decided. Let’s see what we got. Click on most of these to make them bigger.

From Project Connect’s presentation to the CCAG on Friday February 21st:

20140221_PC_Campus_Area

Huh. Look at that. Not only do we not even see West Campus, but we can’t even see the western half OF campus. What a shock!

But it’s probably just a misleading image, right? There’s no way Project Connect would have told everybody they were going to serve West Campus and then not do so – West Campus must be just right underneath the words on the left, right?

Let’s see how far away a couple points on San Jacinto are from a location two blocks west of Guadalupe, using Google Earth. (The center of density in West Campus is not on Guadalupe – the best height entitlements are actually several blocks to the west. A ‘population center’ of West Campus in a few years will likely be 3 or 4 blocks west of Guadalupe; so me using 2 blocks is being generous to Project Connect).

Remember that the rule of thumb in transit planning for years has been that most people will not regularly walk more than a quarter of a mile from their home to their transit stop (or from their transit stop to their office). A few will do more, but the quarter-mile rule ensures you will get most of your possible transit market. Some people lately have tried to assert that good rail transit can do the same thing with a half-mile walking radius; in my opinion, this works in some cities where parking is quite difficult, but primarily on the home end of the trip, not the office end.

First, from 21st and San Jacinto to two blocks west of Guadalupe on 21st:

20140221_21SJ_TO_WC

 

0.6 miles. The main density of West Campus is definitely not served by San Jacinto even by the most generous standard. Guadalupe itself is 0.48 miles away; served only barely by the most generous standard. In other words, the side of campus with the most activity is well outside the commonly accepted walking radius and just barely inside the most generous one.

Now let’s try 24th.

20140221_24SJ_TO_WC

 

0.58 miles to where West Campus’ density starts. West Campus is not served at all by a stop here, either.

Finally, Dean Keeton and San Jacinto:

20140221_DKSJ_TO_WC

 

 

 

Nope. 0.54 miles to the start of West Campus’ density. To the start. Still outside even the most generous reading of “served”.

Project Connect, the claim of yours made back in November is still a lie.

Lie-stamp
On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, tadalafil a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, read more has this kind of soapbox and power.

First, from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.

At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.

Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.

It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.