Why Not Highland, in comment form from OurRail

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.
if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, apoplexy I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.
Lie #1 during Phase 1 of Project Connect was the justification of the collapsing of the West Campus and UT “subcorridors” (zones) into the Core subcorridor/zone “so we could ensure they would both be served by any initial alignment”.

At the time, cheapest on November 1st, see I made this post, which asserted that there was no way this decision was being made to ‘serve’ West Campus; that, in fact, it was being made to avoid having to serve West Campus (which would obviously imply a route on Guadalupe).

Now, the final alignment through campus has been decided. Let’s see what we got. Click on most of these to make them bigger.

From Project Connect’s presentation to the CCAG on Friday February 21st:

20140221_PC_Campus_Area

Huh. Look at that. Not only do we not even see West Campus, but we can’t even see the western half OF campus. What a shock!

But it’s probably just a misleading image, right? There’s no way Project Connect would have told everybody they were going to serve West Campus and then not do so – West Campus must be just right underneath the words on the left, right?

Let’s see how far away a couple points on San Jacinto are from a location two blocks west of Guadalupe, using Google Earth. (The center of density in West Campus is not on Guadalupe – the best height entitlements are actually several blocks to the west. A ‘population center’ of West Campus in a few years will likely be 3 or 4 blocks west of Guadalupe; so me using 2 blocks is being generous to Project Connect).

Remember that the rule of thumb in transit planning for years has been that most people will not regularly walk more than a quarter of a mile from their home to their transit stop (or from their transit stop to their office). A few will do more, but the quarter-mile rule ensures you will get most of your possible transit market. Some people lately have tried to assert that good rail transit can do the same thing with a half-mile walking radius; in my opinion, this works in some cities where parking is quite difficult, but primarily on the home end of the trip, not the office end.

First, from 21st and San Jacinto to two blocks west of Guadalupe on 21st:

20140221_21SJ_TO_WC

 

0.6 miles. The main density of West Campus is definitely not served by San Jacinto even by the most generous standard. Guadalupe itself is 0.48 miles away; served only barely by the most generous standard. In other words, the side of campus with the most activity is well outside the commonly accepted walking radius and just barely inside the most generous one.

Now let’s try 24th.

20140221_24SJ_TO_WC

 

0.58 miles to where West Campus’ density starts. West Campus is not served at all by a stop here, either.

Finally, Dean Keeton and San Jacinto:

20140221_DKSJ_TO_WC

 

 

 

Nope. 0.54 miles to the start of West Campus’ density. To the start. Still outside even the most generous reading of “served”.

Project Connect, the claim of yours made back in November is still a lie.

Lie-stamp
On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, tadalafil a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, read more has this kind of soapbox and power.

First, from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.

At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.

Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.

It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.
On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, viagra a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, has this kind of soapbox.

First, heart from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.
At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.
Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.
It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.
So yesterday, cialis 40mg I saw a couple of self-congratulatory tweets about the upcoming service changes (on Sunday) which start the process of eliminating service to large parts of central west Austin. This was particularly interesting given that I had just added information to our rental property’s MLS listing about “distance to MetroBus” (the #9, at least until Sunday, has a stop about 100 feet away). So here’s what I tweeted in response:


(some short background on the taxes and Red Line issue here)

Shortly thereafter, it was retweeted by another user. Capital Metro PR guy JMVC responded (to that user, not me) that the service change resulted in increased service, and that “you should take what he says with a grain of salt”. I had planned to just link to this tweet but since yesterday I’ve been blocked (JMVC has been non-public tweeting for a long time; although he certainly shares his opinions with most of the local decision-makers despite not being willing to be similarly available to the public).

Here’s the image:

So let’s examine in detail. My tweet:

Continue reading “Why Not Highland, in comment form from OurRail”

Project Connect Phase 1 Lie Number 1

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.
if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, apoplexy I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.
Lie #1 during Phase 1 of Project Connect was the justification of the collapsing of the West Campus and UT “subcorridors” (zones) into the Core subcorridor/zone “so we could ensure they would both be served by any initial alignment”.

At the time, cheapest on November 1st, see I made this post, which asserted that there was no way this decision was being made to ‘serve’ West Campus; that, in fact, it was being made to avoid having to serve West Campus (which would obviously imply a route on Guadalupe).

Now, the final alignment through campus has been decided. Let’s see what we got. Click on most of these to make them bigger.

From Project Connect’s presentation to the CCAG on Friday February 21st:

20140221_PC_Campus_Area

Huh. Look at that. Not only do we not even see West Campus, but we can’t even see the western half OF campus. What a shock!

But it’s probably just a misleading image, right? There’s no way Project Connect would have told everybody they were going to serve West Campus and then not do so – West Campus must be just right underneath the words on the left, right?

Let’s see how far away a couple points on San Jacinto are from a location two blocks west of Guadalupe, using Google Earth. (The center of density in West Campus is not on Guadalupe – the best height entitlements are actually several blocks to the west. A ‘population center’ of West Campus in a few years will likely be 3 or 4 blocks west of Guadalupe; so me using 2 blocks is being generous to Project Connect).

Remember that the rule of thumb in transit planning for years has been that most people will not regularly walk more than a quarter of a mile from their home to their transit stop (or from their transit stop to their office). A few will do more, but the quarter-mile rule ensures you will get most of your possible transit market. Some people lately have tried to assert that good rail transit can do the same thing with a half-mile walking radius; in my opinion, this works in some cities where parking is quite difficult, but primarily on the home end of the trip, not the office end.

First, from 21st and San Jacinto to two blocks west of Guadalupe on 21st:

20140221_21SJ_TO_WC

 

0.6 miles. The main density of West Campus is definitely not served by San Jacinto even by the most generous standard. Guadalupe itself is 0.48 miles away; served only barely by the most generous standard. In other words, the side of campus with the most activity is well outside the commonly accepted walking radius and just barely inside the most generous one.

Now let’s try 24th.

20140221_24SJ_TO_WC

 

0.58 miles to where West Campus’ density starts. West Campus is not served at all by a stop here, either.

Finally, Dean Keeton and San Jacinto:

20140221_DKSJ_TO_WC

 

 

 

Nope. 0.54 miles to the start of West Campus’ density. To the start. Still outside even the most generous reading of “served”.

Project Connect, the claim of yours made back in November is still a lie.

Lie-stamp

For the record

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.
if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, apoplexy I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.
Lie #1 during Phase 1 of Project Connect was the justification of the collapsing of the West Campus and UT “subcorridors” (zones) into the Core subcorridor/zone “so we could ensure they would both be served by any initial alignment”.

At the time, cheapest on November 1st, see I made this post, which asserted that there was no way this decision was being made to ‘serve’ West Campus; that, in fact, it was being made to avoid having to serve West Campus (which would obviously imply a route on Guadalupe).

Now, the final alignment through campus has been decided. Let’s see what we got. Click on most of these to make them bigger.

From Project Connect’s presentation to the CCAG on Friday February 21st:

20140221_PC_Campus_Area

Huh. Look at that. Not only do we not even see West Campus, but we can’t even see the western half OF campus. What a shock!

But it’s probably just a misleading image, right? There’s no way Project Connect would have told everybody they were going to serve West Campus and then not do so – West Campus must be just right underneath the words on the left, right?

Let’s see how far away a couple points on San Jacinto are from a location two blocks west of Guadalupe, using Google Earth. (The center of density in West Campus is not on Guadalupe – the best height entitlements are actually several blocks to the west. A ‘population center’ of West Campus in a few years will likely be 3 or 4 blocks west of Guadalupe; so me using 2 blocks is being generous to Project Connect).

Remember that the rule of thumb in transit planning for years has been that most people will not regularly walk more than a quarter of a mile from their home to their transit stop (or from their transit stop to their office). A few will do more, but the quarter-mile rule ensures you will get most of your possible transit market. Some people lately have tried to assert that good rail transit can do the same thing with a half-mile walking radius; in my opinion, this works in some cities where parking is quite difficult, but primarily on the home end of the trip, not the office end.

First, from 21st and San Jacinto to two blocks west of Guadalupe on 21st:

20140221_21SJ_TO_WC

 

0.6 miles. The main density of West Campus is definitely not served by San Jacinto even by the most generous standard. Guadalupe itself is 0.48 miles away; served only barely by the most generous standard. In other words, the side of campus with the most activity is well outside the commonly accepted walking radius and just barely inside the most generous one.

Now let’s try 24th.

20140221_24SJ_TO_WC

 

0.58 miles to where West Campus’ density starts. West Campus is not served at all by a stop here, either.

Finally, Dean Keeton and San Jacinto:

20140221_DKSJ_TO_WC

 

 

 

Nope. 0.54 miles to the start of West Campus’ density. To the start. Still outside even the most generous reading of “served”.

Project Connect, the claim of yours made back in November is still a lie.

Lie-stamp
On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, tadalafil a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, read more has this kind of soapbox and power.

First, from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.

At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.

Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.

It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.
On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, viagra a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, has this kind of soapbox.

First, heart from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.
At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.
Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.
It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.
So yesterday, cialis 40mg I saw a couple of self-congratulatory tweets about the upcoming service changes (on Sunday) which start the process of eliminating service to large parts of central west Austin. This was particularly interesting given that I had just added information to our rental property’s MLS listing about “distance to MetroBus” (the #9, at least until Sunday, has a stop about 100 feet away). So here’s what I tweeted in response:


(some short background on the taxes and Red Line issue here)

Shortly thereafter, it was retweeted by another user. Capital Metro PR guy JMVC responded (to that user, not me) that the service change resulted in increased service, and that “you should take what he says with a grain of salt”. I had planned to just link to this tweet but since yesterday I’ve been blocked (JMVC has been non-public tweeting for a long time; although he certainly shares his opinions with most of the local decision-makers despite not being willing to be similarly available to the public).

Here’s the image:

So let’s examine in detail. My tweet:

Continue reading “For the record”

What bad guys can accomplish

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.
if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, apoplexy I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.
Lie #1 during Phase 1 of Project Connect was the justification of the collapsing of the West Campus and UT “subcorridors” (zones) into the Core subcorridor/zone “so we could ensure they would both be served by any initial alignment”.

At the time, cheapest on November 1st, see I made this post, which asserted that there was no way this decision was being made to ‘serve’ West Campus; that, in fact, it was being made to avoid having to serve West Campus (which would obviously imply a route on Guadalupe).

Now, the final alignment through campus has been decided. Let’s see what we got. Click on most of these to make them bigger.

From Project Connect’s presentation to the CCAG on Friday February 21st:

20140221_PC_Campus_Area

Huh. Look at that. Not only do we not even see West Campus, but we can’t even see the western half OF campus. What a shock!

But it’s probably just a misleading image, right? There’s no way Project Connect would have told everybody they were going to serve West Campus and then not do so – West Campus must be just right underneath the words on the left, right?

Let’s see how far away a couple points on San Jacinto are from a location two blocks west of Guadalupe, using Google Earth. (The center of density in West Campus is not on Guadalupe – the best height entitlements are actually several blocks to the west. A ‘population center’ of West Campus in a few years will likely be 3 or 4 blocks west of Guadalupe; so me using 2 blocks is being generous to Project Connect).

Remember that the rule of thumb in transit planning for years has been that most people will not regularly walk more than a quarter of a mile from their home to their transit stop (or from their transit stop to their office). A few will do more, but the quarter-mile rule ensures you will get most of your possible transit market. Some people lately have tried to assert that good rail transit can do the same thing with a half-mile walking radius; in my opinion, this works in some cities where parking is quite difficult, but primarily on the home end of the trip, not the office end.

First, from 21st and San Jacinto to two blocks west of Guadalupe on 21st:

20140221_21SJ_TO_WC

 

0.6 miles. The main density of West Campus is definitely not served by San Jacinto even by the most generous standard. Guadalupe itself is 0.48 miles away; served only barely by the most generous standard. In other words, the side of campus with the most activity is well outside the commonly accepted walking radius and just barely inside the most generous one.

Now let’s try 24th.

20140221_24SJ_TO_WC

 

0.58 miles to where West Campus’ density starts. West Campus is not served at all by a stop here, either.

Finally, Dean Keeton and San Jacinto:

20140221_DKSJ_TO_WC

 

 

 

Nope. 0.54 miles to the start of West Campus’ density. To the start. Still outside even the most generous reading of “served”.

Project Connect, the claim of yours made back in November is still a lie.

Lie-stamp
On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, tadalafil a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, read more has this kind of soapbox and power.

First, from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.

At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.

Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.

It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.
On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, viagra a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, has this kind of soapbox.

First, heart from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.
At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.
Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.
It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.
So yesterday, cialis 40mg I saw a couple of self-congratulatory tweets about the upcoming service changes (on Sunday) which start the process of eliminating service to large parts of central west Austin. This was particularly interesting given that I had just added information to our rental property’s MLS listing about “distance to MetroBus” (the #9, at least until Sunday, has a stop about 100 feet away). So here’s what I tweeted in response:


(some short background on the taxes and Red Line issue here)

Shortly thereafter, it was retweeted by another user. Capital Metro PR guy JMVC responded (to that user, not me) that the service change resulted in increased service, and that “you should take what he says with a grain of salt”. I had planned to just link to this tweet but since yesterday I’ve been blocked (JMVC has been non-public tweeting for a long time; although he certainly shares his opinions with most of the local decision-makers despite not being willing to be similarly available to the public).

Here’s the image:

So let’s examine in detail. My tweet:

Continue reading “What bad guys can accomplish”