“The perfect is the enemy of the good” is the enemy of discourse.

I’ve just seen a leader of the getalong gang use that phrase twice in short succession. Cut that shit out.

1. Highland rail is NOT GOOD. It will, we believe, spend all remaining available local capital funds on a service which will increase rather than decrease operating costs. It’s the equivalent of using your last savings to buy into a new business which costs you money instead of making you money.

2. Guadalupe rail is NOT PERFECT. The perfect rail system is like these dumb subway maps floating around, or Patrick Goetz’ ideal of elevated rail through the whole city. Most cities build a Guadalamar surface line precisely because it’s good, not perfect; but good is affordable.

But primarily, can we all agree now that almost everybody who uses the phrase “don’t let the perfect be the enemy of the good” is trying to snooker you into thinking that something bad is actually good? “We have to start somewhere” is meaningless if the thing you start on turns out to end everything because you ran out of money on a low ridership speculative development line.

That’s your quickie for today.

My speech from last night

I ripped up one of the copies I had and gave a short excoriation of the lack of meaningful public input, as this KUT story indicates. Here’s the outline of the speech I was going to give (4 people had donated me time; I’m not sure I could have fleshed this out to 15 minutes if I tried).

Unlike some people who spoke with most or all of their time, I thought it more important to indicate that we didn’t agree with the decision to limit testimony (at the only real public hearing this thing was ever going to get).

1. Background
a. Member of AURA (founding member of the new version; supporter of the old)
b. UTC 2000-2005
i. Mention PG, modern UTC opposition in JD, MDG
c. Writing on transportation since 2003
d. On corner in 2000 supporting LRT with Eric Anderson (LAB)
e. Opposed Red Line in 2004 due to high operating subsidy and low benefit to Austinites
i. (mention this has borne out – operating subsidy ‘down’ from 35 to 18 after cancelling buses; census from rider at Lakeline showing 80% Cedar Park)
2. PC Process
a. In it since beginning.
b. Assured LG on table. No obstacles. (Also assured of this years ago when Rapid Bus was pushed).
c. Process clearly designed with thumb on scales
i. Subcorridors instead of routes
ii. West Campus into Core
iii. I35 ridership into Highland but neither I35 nor 183 ridership into Lamar
iv. Various ‘errors’ all of which hurt GL
v. Bad flier – canvassed at my house with flier designed to fool old people into dropping opposition to plan. No real plans for rail on Guadalupe!
d. At end, people still didn’t know what was best for them!
i. Repeated, strong, unbending preference for Lamar ‘subcorridor’
e. So we brought up the FTA out of the blue
i. Disputed by the guy in charge of Rapid Bus!
ii. Either lying now or lying at beginning.
iii. Getting mixed messages – we’ll do LG right after election but LG can’t ever be done because of traffic but we’ll do it next anyways.
f. Nobody in Austin should trust the output of a process this corrupt. You’re being fed a line about transparency that doesn’t hold up. None of our local transit activists who aren’t connected to the machine believe this.
i. National commentators:
1. Christof Spieler: "It's amazing: Austin, the self-proclaimed progressive city, could have had the best rail system in Texas but has the dumbest."
2. Steven Smith: "Austin light rail is becoming more of a joke by the minute. Textbook example of politics getting in the way of good transit planning."
3. Jeff Wood, Reconnecting America: "I'm going to use this as a bad transit planning example forever"
4. Others at the time ranging from “What A Sham” to “What A Shame”.
5. Honestly have not seen a single national transit person approve this plan.
3. The output
a. High operating subsidies even WITH assumed out of reality growth at Highland Mall
b. No way to tell whether new residents around Highland will work along rail line
i. Mention Mueller – people work all over the city
ii. Birds in hand on a good bus line are worth more than ten birds in bush (working all over city)
c. Theory pushed by Chamber of Commerce that people will hop off I-35, go to park and ride, look for space, walk to station platform, wait for train, ride slow meandering train downtown instead of riding
i. Park and rides DO work but only at far end of quicker, straighter, lines.
ii. Or like in Houston where parking is very very expensive.
d. Urban rail should be urban.
i. Walk to stations from dense residential areas, not apartments in a sea of parking
ii. Entire Airport Blvd segment a waste – only one side can ever be developed; no good crossings to other side and low-density over there
iii. Hancock area – residential only, not as walkable as we need; no opportunity for redevelopment more urban.
e. Respond to density instead of create it
i. Christof Spieler – density wants to be near other density (fill in gaps rather than greenfield)
ii. Most of our supposed TODs underperform compared to background conditions
iii. Remember the TOD up in Leander that was going to help the Red Line?
iv. Crestview Station <<< The Triangle v. Not going to get high quality development in the planning straitjacket around Highland Mall (also remember birds in hand argument) f. Even with their bogus assumptions i. 18,000 boardings/day would be a bad light rail line. BAD. ii. Houston around 35,000/day. Phoenix above 40,000. g. Precludes expansions ANYWHERE else if line isn’t packed i. Operating subsidy argument ii. Horrible spine – slow, windy makes bad backbone. h. Precludes expansions on GL forever even if line is good i. We don’t trust you now after Project Connect Phase 1 ii. FTA reluctant to fund two early lines in ‘same’ area iii. Local politics makes funding 3rd line apparently in NCentralAustin a nonstarter iv. Are they promising Guadalupe or “Lamar subcorridor”? 1. Ridiculous longrange map proposes Guadalupe served after MLK but we suspect grade too high on MLK; doesn’t go south into core of downtown. Why not just stay on Guadalupe/Lavaca? 2. We don’t believe you anyways. 4. Conclusion a. Bad rail line can end system rather than start it b. Don’t mischaracterize our arguments. Highland is not just not our favorite line; it is a BAD line. Never get a chance to build system if you use up all your capital on a second high-operating-subsidy line.

Council, board: Reject the LPA so we don’t have to vote it down.

A letter I just sent to the City Council and Capital Metro board.

Mayor, council members, and board members:

Please oppose the Project Connect Locally Preferred Alternative presented to you tomorrow. This project, far from being the start of a worthy system, will ensure we are never able to develop a strong rail backbone for our area.

Many of you have heard complaints about the Project Connect process. Suffice to say that it’s a nationwide laughingstock at this point. Far from lauding them for their transparency, you should be asking yourselves why the most knowledgeable transit advocates here (and some from outside Austin as well) are opposing this proposal when in most cities, your best transit advocates are the most enthusiastic supporters of a rail proposal.

Courtesy Marcus Denton
Courtesy Marcus Denton

Despite what you hear from Project Connect, this is not simply a matter of wanting rail on Guadalupe and Lamar first. Those of us involved in transit advocacy for the longest time here in Austin and that have the most experience observing other cities have come to the conclusion that for a couple of reasons, building rail on the Highland route means we will never get rail on our best corridor.

The choice of a low ridership route to serve development interests means we will have large operating subsidies for riders compared to existing bus service on that corridor, which will lead to service cuts – a death spiral for transit rather than the virtuous circle we hope rail transit will be when applied to our best corridors. We will have used up our scarce remaining financial and political capital on a line that never pays us back. Rail should be built where it provides operating cost advantages over existing bus services – not where it will cost even more to run.

In addition, there exists substantial doubt among transit advocates that the FTA would ever fund rail on Guadalupe/Lamar if they already funded Highland, due to the proximity of the corridors. Of course, we’d also face political headwinds in building what voters would perceive as a 3rd rail line serving north central Austin.

Please do the right thing and reject this LPA before we organize the voters to do it. I stand with many strong local transit advocates in promising that we will oppose this line if it is placed on the ballot in November, and we will do our best to make sure it does not pass. I hope you do not allow it to come to this.

Regards,
Mike Dahmus
(Urban Transportation Commission 2000-2005).

Project Connect Phase 1 Lie Number 2

“We can’t ask the Federal government to fund urban rail on Lamar/Guadalupe because they already paid for Rapid Bus, and they told us they wouldn’t pay for it, and would instead demand all the BRT money back” or variations of same.

This one has legs. I even believed it myself to an extent, once. It’s a little complicated, because nobody at the FTA is truly going to go on the record, but there’s a couple of angles here that are clearly about Project Connect misleading the public (i.e. misinforming; even lying).

In 2004, though, the project was originally marketed to voters as a “possible placeholder for future urban rail”. Unfortunately, this was before I learned I needed to save images of anything put up by Capital Metro, so you’re going to have to trust my memory on this one. Suffice to say I didn’t find it compelling back then as I believed this was an attempt to get central Austin voters to support the plan but that Capital Metro had no interest in actually following through with the “first rapid bus, then rail” angle. They took down that language right after the election, by the way.

Fast forward, then, to Project Connect in 2012.

The first angle – was it ever on the table?

At the beginning of the Project Connect process, we were told that Lamar/Guadalupe was on the table and would be fairly evaluated. We were also told for years, in no uncertain terms, that Rapid Bus should not be stopped because it was not an obstacle to urban rail there. Now, granted, I didn’t always believe this myself – note that in this very blog, back in 2006, I approvingly linked to a Statesman article about Leffingwell and McCracken halting (for a time!) Rapid Bus because they correctly determined that wasting our best rail corridor on buses no better than current #101 service was incredibly stupid.

Capital Metro and Project Connect employees went to great pains to tell people (in person) that Lamar/Guadalupe was not precluded from the urban rail corridor selection process by the presence of Rapid Bus. This is the only reason I bothered to get involved with the process! People like Jace Deloney were told by people like John-Michael Vincent Cortez that there was no obstacle to Guadalupe getting trains on it. Cortez spent the better part of an hour dissembling at an Urban Transportation Commission meeting to Deloney’s questions about Rapid Bus – saying variants of “well, we could put urban rail there, but why would you ever want to, because Rapid Bus is going to be so great”.

Put a pin in this – we’ll get back to this later.

Project Connect Phase 1 went through their ridiculous, contrived, process which was obviously designed to produce justification for the predetermined rail route to Hancock. I think most of us have finally settled on that characterization by now. But one of the most irritating things, at least to Project Connect, about this process was their failure to convince the public to abandon the Guadalupe corridor as their #1, by far, choice. Despite the flawed (on purpose) design of the study; despite all the shenanigans, people still preferred Guadalupe by large margins to either of the corridors Project Connect wanted them to prefer. People still weren’t choosing the corridors Project Connect had been designed to get them to prefer! Those ungrateful wretches!

So at the very end of the phase, Project Connect and their lapdogs  went on a full-court press to explain to people why, despite massive continuing public preference, we would not be studying Lamar/Guadalupe in Phase 2. The claim was made that they had back-channel correspondence with the FTA that indicated they would not look kindly on ripping out MetroRapid right as it was starting just to put in urban rail. Which is where we get to the next angle. But first:

This is where I really got pissed off.

A lot of people spent a lot of time on the premise that our best rail corridor was, in fact, on the table. I took time away from my job and my family to do so. Many others took much more time away from their jobs and their personal lives. So it’s incumbent on Project Connect to tell us why they lied at the beginning, or why they’re lying now, because it has to be one or the other. Either Guadalupe was on the table, in which case they lied at the end; or it was never on the table, in which case they lied at the beginning. We are owed an explanation for this. I explained that last bit in a note I sent over my Thanksgiving holiday, for god’s sake, and nobody ever even attempted to resolve this at Project Connect or at the CCAG.

The second angle – did they even ask the FTA the right question?

Any urban rail project won’t be tearing up streets right away, even if it passes in November of 2014. The first time you’d see jackhammers and bulldozers would be at least 3 or 4 years further down the road – so let’s say 2017. Additionally, as pointed out by numerous people on both sides of the issue, the proposed alternative urban rail alignment (starter) for Lamar/Guadalupe only overlaps the middle quarter or third of the Rapid Bus alignment. Finally, nobody proposed eliminating Rapid Bus immediately, although I think we can all agree that running buses like that through a construction zone on the Drag would really suck. Slightly worse than running them through normal Drag traffic!

So did they ask the FTA “What would you do if we started upgrading the middle part of the Rapid Bus corridor to urban rail in 2017 or 2018?”

Nope. According to their public statements, they asked the FTA “How about if we immediately stop Rapid Bus1 and start working on urban rail here. How would you guys feel about that?”

Of COURSE the FTA said “you’d have to pay us back our Rapid Bus money”. To that question, why would you expect anything else? But even if we had to pay back the Rapid Bus money, it’s still peanuts compared to how much money we’re going to spend on Urban Rail, both Federal and local.

To equate “Can we just immediately stop Rapid Bus right now” with “Would you mind if we started upgrading the middle part of the corridor 3 or 4 years after service begins, probably continuing to run Rapid Bus as-is on the north and south ends of the corridor” is disingenuous. Misleading. Dishonest. Some might even say – a lie. To say nothing of the fact that during this phase of planning, we’re supposed to be talking about ‘corridors’, not ‘streets’; and some people like “OurRail” are proposing running urban rail a block off the Drag anyways, further reducing the area of supposed conflict to just a mile or two.

Finally, we heard from the guy at Capital Metro who planned the whole Rapid Bus project. Surely he’d set all of the Lamar/Guadalupe partisans right. Surely he’d line up with the fine leaders of the political machine on this one. Right?

The third angle: The guy in charge of Rapid Bus planning

I watched a CCAG meeting where Surinder Marwah spoke, and have been on a lot of email threads where he was CC’ed. He responded in onethread to a question by me of whether John Langmore had ever been forced to explain why the Rapid Bus project manager would support rail on Guadalupe (this is an edit from early versions of this post – I missed it the first time around). His response had a bunch of good technical detail about the FTA, useful life of bus projects, the definition of “permanence”, etc. which I’d have to go seek permission to repost.

However, Lyndon Henry has already done the legwork on this one. From an article in Railway Age:

Indeed, Surinder Marwah — the Capital Metro planner who originally designed the MetroRapid project and helped secure FTA Small Starts funding — corroborates MetroRapid’s role as a precursor to urban rail, and disputes that the project was ever intended to block rail in the G-L corridor. Marwah ranks as a strong and knowledgeable advocate of urban rail in the corridor.

Oops. Well, surely the FTA itself can be trusted to back up the leaders of our local political machine?

The fourth angle: The FTA’s Actual Public Response

Posted by the Central Austin CDC and others, this is the actual content of the response from the FTA to requests for information about this issue:

20131212ftalettertocapmetro

What the FTA says here is that they would consider funding urban rail in this corridor as if it was any other corridor; but they might want some of the BRT money back (because, of course, they were asked the wrong question – listed above).

Even when asked a leading question implying a complete abandonment of the “BRT” investment, the FTA said they’d still be willing to fund urban rail in this corridor. They didn’t promise they would; but for the leaders of our political machine to characterize this, as they have, as “the FTA won’t pay for urban rail there because they already paid for Rapid Bus there” is a LIE.

pantsonfire-animated

That’s all the time I have for now. Look for edits as I get more.

 Further reading


  1. two months BEFORE the buses were to start running 

MetroRapid: What you REALLY need to know

A comment I posted to this PR fluff piece by Movability:

What you need to know is that this REDUCES frequency for current 1/101 riders north of the river, because the 1L is being eliminated along with the 101. If you’re boarding at a stop served by both the 1 and 101 today, the same total number of 1 and 801 buses will stop there in the future; the mix will just change to fewer 1s. If you’re boarding at a stop served only by the 1L/1M today, you’re going to lose half your buses.

What you need to know is that this was projected to be no faster than the 101 in early plans, and now data sent to google maps actually shows it being slower than the 101 (not sure if this is legitimate or a hiccup, but it’s not a good sign).

And finally, what you need to know is that this will cost riders a lot more to ride. Despite the fact that the 1 route was quite likely the least subsidized bus route in the city before this change, fares are going up due to this change (the 801 will cost quite a bit more than the 1 did).

The FTA and last night

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.
if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, apoplexy I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.

No sir, I don’t buy it.

My work situation is going to prevent me from making much effort on this today so please assume I endorse this product and/or service 100%.
No, and the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, bronchi in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.

Why shouldn’t we just say we’ll play along if they come clean about Rapid Bus?

This meme has been floating around the tworterverse. The words below were sent by me over Thanksgiving in response to an email from a CCAG member who sought insight from us (a selection of pro-Lamar/Guadalupe people) on why we thought we should pursue this corridor despite the implied conflict with Rapid Bus (a post on which I owe the community but am less motivated to do so every day – suffice to say it’s not a major improvement, breast and certainly not worth delaying good rail over).

The meme I refer to above is this: Project Connect is now halfheartedly threatening that if we keep pushing Lamar, nurse who knows what might happen with the FTA? Some have responded with “prove that the FTA would punish us severely and we’ll simply give up and move on”. To that I point you to some key parts of the email below – a lot of people (myself included but by no means the most) spent a lot of time on the word of certain staff members involved in this process that urban rail on Lamar/Guadalupe was IN NO WAY precluded by Rapid Bus, so we should join the team and play along and it would definitely get a fair shake. I don’t know about the rest of the gang, but now that I know my time was spent under false pretenses in order to lend some political capital to Project Connect, it’s going to take a lot to get me to not reflexively oppose whatever variant of Highlandmueller they end up crapping out.

Huge, effusive, public apologies, preceded by humble admissions of wrong behavior, would be the bare minimum it would take to even open that conversation.

The email (most of it, anyways), responding to the question “Could you please share with me your opinion of what would happen with regard to the upcoming 801 and 803 routes & resources if we try to add rail to Lamar or Burnet, and how that would affect Austin’s relationship with the FTA regarding funding the rail and other future projects?”

(CCAG member),

The simplest answer is that we don’t know – the future is hard to see.

The next simplest answer is that we were never able to get anybody who could get a reliable answer to be willing to ask the question. This is an important point; I myself spent many years arguing that we couldn’t put our first rail investment on L/G because the FTA would put the kibosh; but this becomes less of an issue as the years pass, and nobody’s willing to get a real answer. (No, this is not an answer a guy like me or even (pal) can get with any certainty, but people at the city and at Capital Metro certainly could). Why haven’t they?

(Other pal) makes a lot of compelling points, but the lack of a real desire to get a real answer from the actual people with that actual responsibility speaks volumes to me. I was a skeptic about this process at the beginning, and became somewhat less skeptical as we went along thanks to the incredible hard work of (list of pals). Those people invested a hundred times my effort, which was still substantial enough to cause me some degree of friction at home and at work. Importantly, at the beginning of this process, they were told by (staffer mentioned by name) and other PC staff that Lamar was not off the table; that Rapid Bus did not preclude urban rail there.

The problem is that they then invested that incredible time and effort, granting PC a degree of legitimacy through their own efforts and hard-earned political capital. If that contention turned out to be false, as I now believe it to be, then Rapid Bus got some free time without opposition (remember in 2006, then council members Leffingwell and McCracken voted against it precisely because they were told it would preclude urban rail!). And Project Connect got a bunch of people involved in a process which was never legitimate to begin with.

IF rapid bus factually precludes urban rail at the FTA, that last paragraph or two are not opinion; they are fact. Sad facts; facts I moved away from believing at one point, which is one reason why I found myself surprisingly ticked when the ridiculous Highlandmueller recommendation came out (unlike our mutual acuaintance (other pal) who never wavered from the cynicism and skepticism many thought I shared in equal or greater degree).

IF rapid bus factually precludes urban rail at the FTA, PC owes a lot of people a lot of apologies, and I don’t know if we can get behind whatever rail recommendation ends up happening after being used to this degree to support a process which was never open to our preferred route to begin with.

Now if rapid bus DOESN’T preclude urban rail at the FTA, then we still have some degree of working relationship to preserve. At that point we have to give Lamar/Guadalupe a fair reading, unlike the ridiculous nonsense it’s gotten so far.

So go back to why nobody wants to ask. Two possible reasons come to mind:

1. They know the FTA will say it precludes urban rail, and they don’t want to have had that answer because of what I said above.

2. They suspect the FTA might say it does NOT preclude urban rail, and they don’t want to get that answer. Why not? I’ve believed for many years that many people in the establishment here don’t want to admit what a pig in the poke we got with Rapid Bus. I still believe that now; I think this is the most likely answer.

Regards,

Mike

The outline of the speech I didn’t give

[evp_embed_video url=”http://dahmus.org/20131115ccagcomment.mp4″]
to which I do not know how much energy I shall devote as it appears to be oriented towards an effort to get buy-in from the more general public who doesn’t even understand transit rather than correcting their horrible process so far. But consider this a cry for reinforcements, store and an argument against civility at the expense of policy. I don’t know if I’ll even be involved this time.

Tonight SHOULD be about the citizens of Austin telling the planners that you see through this bullshit exercise in expensive obfuscation that the machinery of the city1 and Capital Metro2 have collectively foisted on you to try to make previous plans look less stupid. It SHOULD be impossible for the ringleaders to successfully pull off a propaganda coup. But are enough of you going to be willing to fight; to be uncivil?

Tin-Foil-Cat-Hat-1

Me, right now, I’m rapidly becoming disillusioned about the prospects of anything improving life in Austin as even most of the people on ‘my side’ of the rail debate in Austin continue to be more interested in staying friends with the gladhanding jackasses who got us to this point than doing the right thing3 . Yes, there are still far too many people who think JMVC is their buddy; who trust the lying smile from the guy paid to mislead you more than the asshole who tells the truth, because the paid misleader shakes your hand once a week and is at all the right meetings and all the right events, while the asshole is just an unpaid hobbyist you mostly hear from on the internet who can’t devote significant time to the meetingocracy as he continues to fail to find a job downtown4 and must, therefore, ‘participate’ almost exclusively electronically from his desk near godawful Westlake High.5 There are still far too many people who won’t go out on a limb in public beyond modestly suggesting ‘this is slightly less than optimal’ while thanking the people who produced the misleading propaganda for their hard work; and then attack the manners of those like me who keep wanting to point out the Emperor’s bare ass. And there are still far too many theoretically pro-transit people who will line up behind an unquestionably bad policy decision because they think it’s good politics.

thanks

Why thank Project Connect for all their hard work when it was done in the service of a transparently obviously rigged process designed to subvert good planning and the will of the people? If you’re a Democrat, do you go thank George Bush’s staff for working so hard to help him achieve his goals, when you disagree with both the goal and the method? I’m struggling to find better analogies but I find this incomprehensible – lots of people do hard work for bad actors; do they really deserve our THANKS in the process? When they KNOW they’re doing bad work and misleading people? (This is not an opinion, people; there’s no other rational explanation for some of PC’s whoppers. When the reaction of people who watch transit planning all over the country is “#WhatASham” or “I’m going to use this as an example of bad transit planning forever”, does anybody honestly expect thanks?)

That being said, it brings up an interesting parallel – there were many people in Congress who worked to pass Obamacare knowing it was the politically wrong thing to do but it was the right thing for the country. Many of these people were warned it might serve as the end of their political career. It certainly burned up all of Obama’s political capital.

As I recall, though, more than one was uncharacteristically honest about it – “if not for this, then why are we here?” at least one said. Why bother to accumulate the political power if it only leads to attempting to maintain or enhance said power, instead of doing the things that you were sent to do? Doesn’t mean you die on every hill; but if you’re not willing to die on ANY hill, why are you even there?

mr_smith_goes_to_washington_61073-1920x1200
“But what if people are embarassed? Never mind; I’d better just sit down and play along.”

The same is true here. What good is it to remain friends with the consultantocracy and the gladhanding jackasses if, at the end, the big payoff is a rail line to Highlandmueller with 8,000 boardings/day, and it’s 2040 before we can start to have another rail conversation?

Waiting for urban rail on the corridor that makes sense
Waiting for urban rail on the corridor that makes sense

If you’re falling in line because it’s good politics, in what world do you think we get to build a second urban rail line before those of us my age are dead, when the first line has 8,000 boardings a day? When we need somewhere in the low 20,000s to be considered a moderate success worth building off of?

Was the Red Line worth this very same compromise, which so many took in 2004 and urged me to take? I’d argue you’d be an idiot to think so today, but in fact, many still think so, despite the fact that it’s reached its ceiling at a whopping 2000 boardings/day; despite the fact that its monstrously high operating subsidies to mostly non-Austinites from mostly non-taxpaying cities have led to cuts in bus service for the people who pay >90% of Capital Metro’s bills. How was that a good policy decision, if it didn’t lead to another serious rail conversation until 2014; and if even then, we can’t have an honest POLICY decision about the next rail line – we still have to play idiot politics so certain people don’t look stupid about overselling the reality of Rapid Bus or Mueller? And how can those people think they made the right decision back in 2004? Hell if I know; I’m just a guy who can spend an hour every other week on this, but it sure seems obvious to me. Why is this so goddamn hard?

After I gave my short speech at the CCAG, I was actually lectured by a well-connected insider / former neighbor; and then later by a UT VP; that the fault for any lack of rail on Guadalupe/Lamar is mine, presumably for daring to continue to have contrary opinions on this and voicing them publically, which is Bad Form, instead of swallowing my objections and joining the meetingocracy.6 That it’s my fault that they have not been convinced – or in another sense, that the job in Westlake; raising three kids; trying to keep a company afloat and a couple of teams from being laid off; that these are all not valuable things to these people; and thus their inability to be convinced of what every transit professional from around the country finds inherently obvious is my fault because I haven’t quit those other responsibilities and spent months producing essentially the same research other allies already have only to have it ignored in favor of the continuous examples of ‘mistakes’, other faulty data and the rigged analysis produced by full-time people being paid to mislead the public.

Pictured: Project Connect
Pictured: Project Connect

I don’t have much more energy for this; and I’m not optimistic. At the end of this, I expect most of my putative allies on the G/L side to say “well, we tried” and go back to the consultantocracy, welcomed with open arms because they didn’t fight too hard.

Fuck that. Either fight hard or sell out; but don’t tell me you’re doing the first when you’re really doing the second. And you can’t fight at this point by staying friends with Project Connect; they are now the enemy. The place we have to win now is the City Council, because the CCAG has already made up their minds, and if we don’t get the City Council to FORCE them to change, it’s a done deal for Highlandmueller. This is going to require fighting to various degrees – Project Connect is a lost cause. If you could convince me of a rational path which includes “continuing to treat Project Connect like rational actors who are doing a good job and not trying to mislead people” and ends with victory, you’d have done so by now.

Your pal,
M1EK
Back when I thought the order was communications, migraine THEN decision; the speech I was going to give in outline form:

  • Introduce self, name, AURA supporter, UTC, blog
  • Mention letter from AURA & agree with points but here to talk about…
  • Is Rapid Bus really an impediment to rail on Lamar?
  • KK says so sometimes in public
  • AURA and others trusted claims made by staff of Cap Metro and Proj Connect that everything was on the table
  • Why shouldn’t rapid bus be in the way?
  • Others have made points: Depreciation, timeframe, movable ‘investment’
  • Mine based on QUALITY of improvement – all points apply only to 801 north of river
    • If you ride a 101 today:
      • No faster
      • More expensive
      • Couple more trips per hour (shift from local to express)
    • If you ride a 1 today:
      • Lose half frequency or have to walk much further & likely pay more
    • You may gain: GPS (next bus). Not that useful considering argument in favor of MR is that you won’t care about the schedule.
  • NOT BRT – refer to ITDP standards and Jace’s scoring; not even close.
  • Circle back – used Cap Metro’s OWN DATA which trumps marketing / soft features
  • Just today? Linda Watson called it “Austin’s densest corridor”.
  • Conclude

  1. curiously, not city council itself, which has been to this point almost completely uninvolved in this process beyond the Mayor; see the end of the post for more 

  2. somewhat likewise as with the city, although their leadership is a little more bought-in to this than the city’s is 

  3. some will chide me that I give people like this guy way too much importance; that they aren’t decision-makers. True in a sense; but they are constantly in the ears of the decision-makers, and constantly in the ears of the media (except for one or two notable exceptions, and in one case, he’s actually convinced everybody on the pro-transit side that the media member was the problem to the point where I’m pretty sure I’m the only rail advocate who will even talk to the guy). Or they may say that nothing is served by fighting guys like that, but I firmly disagree; because NOT fighting guys like that gives him his power, which he then uses to co-opt you into providing legitimacy for this illegitimate process that will produce the predestined result. I say wait until this gladhanding jackass in question has convinced some members of the media and some council staff that you’re a troll before you judge me for caring about this too much. 

  4. note: it would have been a lot easier to do this if we had GOOD rail heading downtown and it wasn’t so ridiculous for non-single-website heavier-duty software companies to locate there 

  5. yes, this is part of the reason for the bile. God, I hate Westlake so much. 

  6. these are people who actually believe, or profess to believe, that you get rail on Guadalupe right after you build a massive failure to Highlandmueller; and thus if you push too hard now you’ll not get rail on Guadalupe, which is ridiculous as rail on Highlandmueller, guaranteed failure that it is, assures we won’t see rail on Guadalupe/Lamar until I’m long dead