Dear Jennifer Kim

Contrary to what Sal Costello’s band of merry anti-tollers alleges, healing pills SH45 and SH130, viagra order as tollways, purchase were always supposed to get money from the 2000-2001 city and county bond packages. I remember; I was arguing against it at the time (not on this crackplog; it didn’t exist yet; but still).
Shame on KXAN for just reporting this as fact. Mayor Watson didn’t “re-allocate” any money towards these toll roads; before the election, the city was advertising that these two tollways (and a third, Loop 1 North) were in fact the primary expected recipients of the right-of-way purchase money. While Austin didn’t promise exactly which road projects would receive funding, it was crystal clear at the time that a good chunk of right-of-way purchases were going to go to these tollways.
Costello appears to be hanging his hat on the weak argument that the city bond language didn’t SPECIFICALLY say that any money would go to “tollways” or “toll roads”. But neither did the city bond language say “freeways” or “free roads”; it said that a large chunk of the transportation bond would go to right-of-way contibutions for state highways, which it did. And the city didn’t mislead anybody into thinking these would be for non-toll-roads; again, backup materials before the election clearly indicated that they intended to spend these funds on SH130, etc.
The city, unlike the county, chose to group all transportation bonds together as a tactical move to try to get them passed, rather than risk environmentalists voting against the highways chunk and motorists voting against the bikeways/pedestrian chunk. That’s the only reason they didn’t have separate SH45 and SH130 items.

Inspired by DSK’s posting of his wife’s snapshots, pulmonologist I present: the most ironic picture of IceStorm 2007. Click for bigger.

Yes, them icicles was over a foot long. And yes, they formed on my icicle lights.

Well, viagra 60mg except for me, rheumatologist that is.
From Christof’s excellent site in Houston,
this is the kind of discussion we needed to have here in 2000 and again in 2004. Of course, I believe we were about to have this kind of planning in late 2000 for a May or November 2001 election, until Mike Krusee forced Capital Metro to hold the election in November of 2000, before they were remotely prepared to do so. In 2004, nobody bothered to look at the line’s routing and figure out whether it served the needs of choice commuters (people who aren’t willing to ride the bus today). Again, except for me. So here’s a recap, with a new exciing picture at the end.
Note the references to 1/4 mile being the typical capture area for a rail stop (despite what you hear from people who think the typical commuter will walk the 1/2 mile or more from the Convention Center stop to their downtown office building).
Here’s a similar image I’m working on for Austin. I’m no photoshop wiz, obviously, but this might be the best I can make this look, so here you go. The original image comes from “Mopacs”, a poster to the Skyscraper Forum. I’ve drawn in the 2004 commuter rail route in yellow (just barely penetrates the picture on the lower right); the 2000 light rail route in green; and the maybe-never streetcar route in red. Note that the streetcar doesn’t have reserved-guideway, as I’ve noted before, so it’s really not going to help much in getting choice commuters to ride.
Click for full image if you don’t see the yellow route!

The big building you see just north of the yellow line is the Hilton Hotel (not a major destination for choice commuters; anectdotal evidence suggests that a large percentage of workers there actually take the bus to work today).
Note that the walking distance from the yellow stop to the corner of 7th/Congress (rough center of the office buildings on Congress) is a half-mile, give or take which, as I’ve pointed out before to the derision of people who don’t study transportation, is about twice what the average person will walk to a train station if they have to do it every day. Capital Metro knows this, of course, which is why their shuttles are planned for not only UT and the Capitol, but also for downtown; their only error is in repeating the Tri-Rail debacle by forgetting that choice commuters don’t like riding the bus.
Also note in the upper reaches of the image, the other two critical employment centers downtown – the Capitol Complex and UT. Notice how the green line (2000 light rail) goes right next to them as well. What you don’t see is further up to the north, the green line continues up the only high-density residential corridor in our city – that being Guadalupe Blvd., so in addition to being able to walk to their office _from_ the train station, a lot of prospective riders would have been able to walk to the train station from their homes.
That’s what Mike Krusee took away from Austin, folks. And it ain’t coming back once commuter rail opens; there’s no way to operate anything like the 2000 light rail proposal cooperatively with this worthless commuter rail crock.
Update: Here’s the other aerial photos from “Mopacs”. Worth a look.

I understand your retreat into pandering given the difficulties you’re currently facing, adiposity and I even sympathize a bit, women’s health but let’s be clear: big retail and employment destinations do NOT NOT NOT NOT belong on frontage roads.
Here’s why.
This talking point works well with people who drive everywhere – like most folks in Allandale. It doesn’t work so well with people who actually have some experience with alternate modes of transportation, like yours truly. I used to occasionally ride the bus in the morning and get off at the stop on one side of 183 between Oak Knoll and Duval and have to go to exactly the other side – and the presence of frontage roads (destroyed an old road which used to cross) made a 2-minute walk into a 10-minute bike ride (30-minute walk). No wonder nobody else does it.

m1ek

blahg