Commuter Rail #48: It’s Not Light Rail, No Matter What You Say

Comments Off on Commuter Rail #48: It’s Not Light Rail, No Matter What You Say

I had a good lunch with Dave Dobbs about two weeks ago. Dave’s a stand-up guy who is really working hard to get more mass transit on the ground in Texas cities, including Austin. So, any disagreements exposed in this article are honest ones; both Dave and I want more mass transit, not less. In fact, we both want more rail transit, too.

One of the things being floated in the face of center-city opposition to Cap Metro’s new long-range plan is the idea that commuter rail is practically the same thing as light rail, except cheaper, so why would any of you light-rail guys oppose it anyways. Dave, in particular, was exasperated by my insistence in calling this plan “commuter rail” and comparing it to other commuter rail lines, such as Tri-Rail’s disaster in South Florida. Let’s analyze the things that were good about light rail, and see if that holds up:

The primary positive aspects of the 2000 light rail proposal, in my opinion, are (were):

  • Very short headways (initially only moderately short; but double-tracking the entire length of the corridor meant it would be easy to go to very short headways).
  • Opportunity for dense transit-oriented redevelopment in the Robinson Ranch, the Burnet/Metric corridor, and the Lamar/Guadalupe corridor
  • Electrified runningway (means that the vehicle can accelerate and stop fairly well, runs fairly quietly, and does not pollute at source).

In addition, the light rail route would have alloed for pickup and delivery of passengers via pedestrian arrivals (i.e. less than a ten-minute easy walk to or from the station) at all of the following major attractors (north-south):

  • Park and Rides in far northwest Austin and suburban areas
  • Robinson Ranch
  • Metric Blvd / Burnet Rd tech employers (including IBM)
  • University of Texas Pickle Research Campus
  • Huntsman site (near Airport/Lamar)
  • Central Market / Central Park (38th/Lamar)
  • 38th St medical complex
  • University of Texas main campus
  • State Capitol complex
  • Congress Avenue
  • City Hall / CSC
  • South Congress

Evaluating the commuter rail proposal on the same metrics, we have:

  • Very long headways initially (every 30 minutes). Most bus routes in the city operate this frequently or more frequently, and yet one of the most common complaints from passengers is that they have to wait too long for a bus. This is unlikely to improve without double-tracking the whole corridor, and even then, I doubt whether headways could be improved beyond 15 minutes due to the performance characteristics of commuter rail vehicles.
  • Dave thinks the same opportunities for redevelopment exist (of course, in different corridors in some cases). l disagree – in no city in the USA has commuter rail ever resulted in the type of transit-oriented redevelopment you see with light rail, and it’s not a simple terminology difference. I’ll address this component in a later article. Even if Dave is right, the Lamar/Guadalupe corridor (and hence the near-UT areas which would be most obviously ripe for transit-oriented development due to their demographics) are not served by this plan.
  • These vehicles are going to be diesel locomotive-driven. At best, they might be similar to the RegioSprinter which was run around town a few years ago for a demonstration. These vehicles are likely to be far noisier, more polluting, and have worse acceleration and deceleration characteristics than would a typical light-rail vehicle.

And for pickup/delivery, we have:

  • Park and Rides in far northwest Austin and suburban areas
  • Robinson Ranch
  • Metric Blvd / Burnet Rd tech employers (including IBM)
  • University of Texas Pickle Research Campus
  • Huntsman site (near Airport/Lamar)
  • Convention Center

Some might argue that Cap Metro’s map shows this line going to Seaholm, and that a station at 4th and Congress is likely. I disagree:

  • Adding commuter rail trackway in the street is much more difficult than it would have been to built a LRT runningway. It will also interfere with plans for the Lance Armstrong Bikeway. Expecting this rail to be built anytime soon is a fool’s hope. And if reasonable headways (less than 30 minutes) are to be delivered, this will require double-tracking the entire downtown stretch. Keep in mind that this rail will be wider than the light rail trackway would have been.
  • Even when built, the idea that downtown can hang its hopes on a station that will definitely be at 4th and Congress is foolish. That’s too close to the station at Seaholm to be feasible (ironically, this is true even though the station at Seaholm is too far away to make pedestrian access to Congress feasible for most – IE, it’s too close for the vehicle but too far away for people).

Unfortunately, instead of opposing the plan on its (lack of) merits, most of the center-city people are wasting their time pushing for a quicker path to Seaholm (again, on the questionable principle that they can get a station on Congress by doing so). They then make this extraordinary claim:

“A rail line through the middle of downtown would allow a high
frequency circulator to quickly and efficiently carry commuters north,
to the Capitol complex and the University of Texas, and south, to the
South Congress District.”

We have that high-frequency circulator already. It’s called the Dillo, and nobody who has free or cheap parking ever uses it, because it’s dog-slow, because it’s stuck in the same traffic as your car would be.

m1ek

blahg