This has come up frequently in the past in regards to the idiocy of claiming that major retail belongs out on the frontage road (where I have claimed in the past that it’s impossible to practically provide good transit service). Here’s a much better version than my previous one, and as a bonus, MS Paint was still tangentially involved!
(For non-Texas readers who may have wandered in from Jeff’s excellent transit portal, almost all limited-access highways in this state are built from pre-existing major arterial roadways – where property access is maintained via the construction of new “frontage roads” which unlike perimeter roads often used for that purpose in other states, also serve as on-and-off-ramps. The incredibly wide road footprint that results makes it far more expensive to build new or maintain existing crossings over or under the highway).
Both images from google transit; click through for full details. This is basically the “how do I get from the drop-off for the express bus at the park-and-ride on the west side of the road to the entrance to all the office parks on the east side of the road”. Note that the address for the park-and-ride you sometimes get (12400 Research) doesn’t match the actual location, which is on Pavilion Boulevard back towards Jollyville.
First, the transit directions, which look pretty good at first:

Then, the driving directions, which look like this:

Huh. Wait a minute. If I can just jump across the road, why do the driving directions have me go down a mile and back? Let’s look at the satellite image:

Oh. Now I see. Note that the bus stop images you see on the other side of the road are for a poorly performing cross-town route which suffers from the same basic problem – if you need to leave an office on that side of the street and go southbound on 183 back home, you get to walk to the next crossing – which on a normal street wouldn’t be that big of a deal, but crossings of frontage roads are few and far between. Farther to the northwest, crossings are even less frequent – you face a walk of close to 3 miles in spots to make this trip across the freeway. Taking that cross-town route would be even worse than taking the express plus the incredibly long walk, because it would require a long slow trip down the frontage road and then a transfer to a second bus, and because the service on the frontage road is inevitably low-demand, it doesn’t run very often either.
Keep in mind that this is just to cross the freeway. If you work at the Riata office park, you then face another walk of a half-mile or so inside the complex. I used to do this commute on my bike, with bus boost in the morning at times and am very familiar with the area – ironically, proximity to the Pavilion transit center was supposedly touted as a positive for this development when it was originally proposed. I was always pretty sure Pavilion used to connect with what is now called Riata Trace Parkway when 183 was just a six-lane divided arterial but have never been able to find a clear enough old satellite image to confirm, but our Tennessee correspondent has already confirmed in comments that it did cross.
For reference, my last job before this one was also on US 183, but between Balcones Woods and Braker Lane, which was much more accessible by transit – and yes, I did sometimes take the bus even on days where I wasn’t biking. I tried the bus commute once to Riata and never did it again – that walk, in addition to being far too long even for a nice comfortable express bus, is just dreadful, even compared to conditions down by Braker.
And, yes, there’s a personal reason this is coming up now too. All I can say now is dammit, dammit.
Meta
-
Recent Posts
Recent Comments
- m1ek on Rapid Bus versus existing conditions on the #3 corridor
- Novacek on Rapid Bus versus existing conditions on the #3 corridor
- m1ek on Rapid Bus versus existing conditions on the #3 corridor
- m1ek on Rapid Bus versus existing conditions on the #3 corridor
- Novacek on Rapid Bus versus existing conditions on the #3 corridor
Archives
- May 2013
- February 2013
- January 2013
- December 2012
- October 2012
- May 2012
- March 2012
- February 2012
- December 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
- March 2011
- February 2011
- January 2011
- December 2010
- November 2010
- October 2010
- August 2010
- July 2010
- June 2010
- May 2010
- April 2010
- March 2010
- February 2010
- January 2010
- December 2009
- November 2009
- October 2009
- September 2009
- August 2009
- July 2009
- June 2009
- May 2009
- April 2009
- March 2009
- February 2009
- January 2009
- December 2008
- November 2008
- October 2008
- September 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- December 2007
- November 2007
- October 2007
- September 2007
- August 2007
- July 2007
- June 2007
- May 2007
- April 2007
- March 2007
- February 2007
- January 2007
- December 2006
- November 2006
- October 2006
- September 2006
- August 2006
- July 2006
- June 2006
- May 2006
- April 2006
- March 2006
- February 2006
- January 2006
- December 2005
- November 2005
- October 2005
- September 2005
- August 2005
- July 2005
- June 2005
- May 2005
- April 2005
- March 2005
- February 2005
- January 2005
- December 2004
- November 2004
- October 2004
- September 2004
- August 2004
- July 2004
- June 2004
- May 2004
- April 2004
- March 2004
- February 2004
- January 2004
- October 2003
- September 2003
Categories
- 2008 Light Rail
- Austin
- badgers
- Bicycle Commuting
- Bicycling in Austin
- Charts and Graphs
- Don't Hurt Us Mr. Krusee, We'll Do Whatever You Want
- Driving in Austin
- Economics
- Empty Buses
- Funding of Transportation
- High Grade Bile
- I Get Hate Mail
- I Told You So
- IM hilarity
- Lousy Bike Facilities
- metablog
- Music
- Personal
- Politics (Outside Austin)
- PS: I am not a crackpot
- Rapid Bus Ain't Rapid
- Red Line Myths
- Republicans Hate Poor People
- Republicans Hate Public Transportation
- Republicans Hate The Environment
- Sports
- Subsidies to Suburban Sprawl
- Technology
- Terms I Have Coined
- Texas Republicans Hate Cities
- The Shoal Creek Debacle
- This Week In The Chronicle
- Transit Field Trips
- Transit in Austin
- Transportation
- Tri-Rail
- Uncategorized
- Urban Design
- Use Cases
- Walking in Austin (Pedestrian Issues)
- When Neighborhoods Go Bad
- Worst Person In Austin
You’re correct that before the (1998?) 183 freewayizing segment happened, Riata Trace connected across 183 to what is now Pavillion.
It’s so weird to read this today. I was at exactly that location two hours ago.
Indeed I had to take the long walk around the freeway segments. Along the way, the sidewalk was closed. Signs instructed me to “use the other side of street”… but this was a frontage road, so the other side of the street would have required a few miles of a walk. I called 311 for this, but on this occasion, without having yet given the location, I was told that public works allows sidewalk work to block sidewalk access for up to a few days without requiring alternate pedestrian routes, and that public works will not act upon a request to guarantee an alternate safe pedestrian route.
Then I encountered a pedestrian crossing signal button that failed to trigger the walk signal. I was there through at least three signals. I called 311 to report it — service request # 006211. It was at Research Blvd. and Oak Knoll Rd, southwest corner, westbound as a pedestrian, crossing the southbound frontage road.
Related: The Riata community roads that I encountered offered sidewalks, but not any crossings.