Now that RG4N has struck out, it’s time to assess the damage. RG4N is interpreting the judge’s decision not to comment on three of their four complaints as evidence that they were valid which is spectacularly delusional. Good show, folks. Thanks to the Chronicle for, even now, supporting RG4N’s desperate attempt to spin this as something other than a complete truth-slap. Hint: it’s not “curious” she didn’t address the “other claims”; it was predicted by a real lawyer quite some time ago.
I’m going to cover this in two or more parts; today’s is just a conservative estimate of the direct and immediate costs and what we might have otherwise done with that time and money.
The city’s legal costs are oft-quoted at $424,000. This is at least the contract with Casey Dobson. I’m going to be extremely conservative and round up the city’s direct costs to $600,000, including other legal costs, the time and money spent responding repeatedly to RG4N’s complaints (and to city council members who were desperately trying to find an angle to work).
Other direct and short-term costs I could have considered, but didn’t:
Lost sales taxes: I’ll be completely conservative and assume that every single dollar of sales tax we don’t get from six months or so of delayed opening would have just been shifted from other Wal-Marts or other stores in the city. I don’t believe this to be the case; if it were that simple, Wal-Mart wouldn’t be so eager to build the store. More likely would be a shifting of the natural coverage area of each store – with stores on the edge of Austin becoming less crowded and hence more attractive to shoppers further out, but this is hypothetical and impossible to measure. Easier to believe but still harder to measure would be the lost tax revenue from other businesses in the center which don’t have easily subsitutable competition – for instance, a delay in the move of the ice rink.
Lost property taxes – despite what you hear from RG4N trolls on the Chronicle’s blog, there is a property tax impact to this development – the land value may increase, or it may not, but I guarantee the structure value will increase dramatically – and the city gets to tax that building value (as does the school district, county, etc.). Impossible to estimate now precisely what that will be, but common sense would tell you that it will be substantial enough to consider as a major benefit of the redevelopment given that the structure value of the existing ghost-mall is measured at just south of 16 million.
Lost bus fares: I’m 1000% positive that the opening of this store will result in a major bump in ridership to and through the Northcross transfer center, which gives Capital Metro more fare revenue with zero extra cost (since they probably wouldn’t increase service until the buses were overflowing, given their past history). But again, hypothetical and impossible to estimate.
So let’s leave the direct and short-term cost at a mere $600,000 (the cost to the taxpayers; RG4N and the careening-towards-bankruptcy Allandale Neighborhood Association have their own set of costs, of course).
What could we have done with that money? Well, me, I’m a transportation guy. So I’ll give you two simple transportation options, and another one dear to my heart. Y’all are welcome to chime in as well.
12,000 linear feet of sidewalk at $50/linear foot. (Estimate obtained from a wide range of sources on the web; corrections welcome). That’s two and a quarter miles of sidewalk, folks, enough to cover a big chunk of the sidewalk gap in the densest parts of Central Austin (where the pedestrians actually are).
Restriping Shoal Creek Boulevard into the safe, sane design that every other city would have done – and in fact, recommended to us. Just read those archives. And the same people who cost us the $600K this time are the ones who cost us the million on SCB in the first place, don’t forget. Parking on both sides instead of just one was just that much more important than cyclist safety.
Operate a branch library for a year. Every time we go through a hiccup in the budget, we have to close libraries or delay their opening. I can’t get a breakdown precisely from the city budget after ten minutes of scrutiny, but I’m betting one of the branches could run for a year on that much money (operating expenses).
So there’s three. Anybody else have any suggestions? Of course, none of these were as important as catering to the tantrum of a bunch of people who just really really really REALLY don’t like Wal-Mart, and want us to engage the Care Bear Stare against the legal system.
Next up: the indirect and long-term costs (such as foregone opportunities to improve the site plan with the supercenter intact).
Meta
-
Recent Posts
Recent Comments
- m1ek on Rapid Bus versus existing conditions on the #3 corridor
- Novacek on Rapid Bus versus existing conditions on the #3 corridor
- m1ek on Rapid Bus versus existing conditions on the #3 corridor
- m1ek on Rapid Bus versus existing conditions on the #3 corridor
- Novacek on Rapid Bus versus existing conditions on the #3 corridor
Archives
- May 2013
- February 2013
- January 2013
- December 2012
- October 2012
- May 2012
- March 2012
- February 2012
- December 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
- March 2011
- February 2011
- January 2011
- December 2010
- November 2010
- October 2010
- August 2010
- July 2010
- June 2010
- May 2010
- April 2010
- March 2010
- February 2010
- January 2010
- December 2009
- November 2009
- October 2009
- September 2009
- August 2009
- July 2009
- June 2009
- May 2009
- April 2009
- March 2009
- February 2009
- January 2009
- December 2008
- November 2008
- October 2008
- September 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- December 2007
- November 2007
- October 2007
- September 2007
- August 2007
- July 2007
- June 2007
- May 2007
- April 2007
- March 2007
- February 2007
- January 2007
- December 2006
- November 2006
- October 2006
- September 2006
- August 2006
- July 2006
- June 2006
- May 2006
- April 2006
- March 2006
- February 2006
- January 2006
- December 2005
- November 2005
- October 2005
- September 2005
- August 2005
- July 2005
- June 2005
- May 2005
- April 2005
- March 2005
- February 2005
- January 2005
- December 2004
- November 2004
- October 2004
- September 2004
- August 2004
- July 2004
- June 2004
- May 2004
- April 2004
- March 2004
- February 2004
- January 2004
- October 2003
- September 2003
Categories
- 2008 Light Rail
- Austin
- badgers
- Bicycle Commuting
- Bicycling in Austin
- Charts and Graphs
- Don't Hurt Us Mr. Krusee, We'll Do Whatever You Want
- Driving in Austin
- Economics
- Empty Buses
- Funding of Transportation
- High Grade Bile
- I Get Hate Mail
- I Told You So
- IM hilarity
- Lousy Bike Facilities
- metablog
- Music
- Personal
- Politics (Outside Austin)
- PS: I am not a crackpot
- Rapid Bus Ain't Rapid
- Red Line Myths
- Republicans Hate Poor People
- Republicans Hate Public Transportation
- Republicans Hate The Environment
- Sports
- Subsidies to Suburban Sprawl
- Technology
- Terms I Have Coined
- Texas Republicans Hate Cities
- The Shoal Creek Debacle
- This Week In The Chronicle
- Transit Field Trips
- Transit in Austin
- Transportation
- Tri-Rail
- Uncategorized
- Urban Design
- Use Cases
- Walking in Austin (Pedestrian Issues)
- When Neighborhoods Go Bad
- Worst Person In Austin
Worst of all: RG4N’s leadership had SPECIFIC advice (from multiple neutral and allied qualified sources: legal, political, planning, etc) that this would be the result. But they deliberately and irresponsibly chose and maintained this inflexible course nonetheless, specifically to try to intimidate and force total capitulation (rather than the good faith negotiation that other groups and neighbors were conducting). The net result was, as predicted, nothing more than a collosal waste of citizens’ money. But hey, a few people can add “righteous community organizer” to their resume.
BTW, for your list M1EK, another specific opportunity lost by this suit: the new library could have gone in at a nice pedestrian friendly location at the new development, rather than being forced (by the uncertainty of the site) to default to the lousy location near Steck/Burnet.
Also to be considered is the monetized productivity loss from the city employees, the RG4N folks, and the rest of us who have been following the issue and commenting on the idiocy.
Plus, RG4N & Allandale’s expenditures putting up the fight are also lost money.
But I did find this blog along with AC due to this issue, so that’s a plus for me, I guess.
$600,000 could also pay for a good amount of trail improvements or a piece of the long-fabled extension.