Category Archives: Texas Republicans Hate Cities

Great responses to John Langmore

On days like this where I have no time it’s so nice that others have picked up the slack. I’m just going to republish their comments to Langmore’s disingenuous and mendacious letter to the Chronicle. It is just horrible that a guy like Langmore, a rail consultant responsible for many horrible projects that have set back transit for years due to low ridership and huge operating subsidies, has this kind of soapbox and power.

First, from Chris Lazaro:

One of my biggest problems with Mr. Langmore’s letter is not that he misinterpreted our call to consider Lamar/Guadalupe as a call to pull the plug on MetroRapid (which is not true, by the way). Rather, my biggest issue here is this data that he and others are so quick to trust, despite warnings from trustworthy professionals in the transportation field that the data is both flawed and incomplete.

I can tell you that, as a transportation planner myself, garbage in absolutely equals garbage out–and that is precisely what is happening here. Frankly, some of the metrics used by the Project Connect team to evaluate the transit sub-corridors is laughable and, at the least, should not have been given nearly as much weight as they were. The team can pretend that they altered weights and still identified Highland as the #2 route, but when some of the appropriate datasets are ignored altogether, how can we trust that we have been given the complete picture?

And, beside all of that, Langmore and other Council members have spent all this time defending the Highland sub-corridor that East Riverside (a corridor that we all agree makes sense) is quickly falling by the wayside. It is becoming evident that the Mayor wanted Highland to move into the Phase 2 study, regardless of what else was going on.

At the very least, Langmore, Leffingwell, and the rest of City Council needs to come clean about their intentions for Austin’s next transit investment. If it is to serve the interests of ACC and the Seton Medical Center, then they need to admit that. Hiding behind threats of lost funding and lost support from the FTA will not suffice.

Last, but not least, cities across this country sell Bus Rapid Transit to its residents as an interim solution until rail is affordable along a particular corridor. In other words, cities invest in BRT because they believe it is viable for fixed rail (streetcar, light rail, etc.) and that the system can later be upgraded. If Austin instead wants to argue that its pseudo-BRT system actually precludes future rail investment, then we MUST stop using this upgradability as a selling feature. Period.

It’s time that Langmore, the Mayor, the rest of Council and the Project Connect team be honest about what is happening.

Second, from Cory Brown:

t’s not the least bit unreasonable to question the institutional support of organizations that brought us MetroRail, and its expensive rider subsidies.

It’s also not unreasonable to question the claims of Mr. Langmore, who has chosen to publicly ignore the truth. The next person Mr. Langmore can name as suggesting we “pull the plug on a $48 million investment the month before it opens” will be the first.

If Mr. Langmore & CapMetro can’t be truthful regarding advocates who merely disagree with one facet of their proposal, how can we trust them when it comes to operational costs & ridership estimates?

Third, from Niran Babaloa:

John Langmore’s willingness to misrepresent the arguments of the folks he disagrees with is insulting. Who said we should “pull the plug on a $48 million investment the month before it opens”? The message he has heard from the citizens who disagree with him is clear: do not build a rail line to Highland before putting rail on Lamar. Either start with a line on Lamar and move MetroRapid when the rail line opens a decade from now, or start with East Riverside so Lamar can come second.

As an exercise for the reader, how often do you find yourself needing to head to places on Guadalupe and Lamar? How often for Red River? If you’re like most of the Austinites that are forced to waste their time stuck in traffic on the Drag each day, it’s clear that there are tons of people who want to go places along the Guadalupe/Lamar corridor. We should put rail there.

The question before us is timing. Ideally, we’d start with Lamar, which has the jobs and housing that make it the highest transit ridership already. A good plan B would be starting with East Riverside, where ridership is high, and the zoning allows for enough density for the ridership to be even higher. Highland, however, doesn’t have the density of people or jobs to make for a blockbuster first line, which endangers our chances of building a second and a third.

The biggest issue with Highland is that there is no way voters will approve rail down Lamar once there’s a line to Highland. A second line through Hyde Park before the rest of the city has seen any rail won’t seem fair to most people, and I don’t blame them. Rail to Highland means rail on our best transit corridor won’t happen until the middle of the century. If the places that people want to go can only be reached by buses stuck in traffic, people will stay in their cars, traffic will stay terrible, and we won’t become a city where it’s normal to take transit for decades.

This is the future that the citizens who have been paying attention are trying to avoid. We’re not trying to “pull the plug” on MetroRapid. We’re trying to avoid making the mistake of allowing the backbone of our transit system to remain slow for decades. Join us, and tell city council that if they put a rail line to Highland on the ballot, you’ll vote against it.

Finally, Mark Cathcart expresses his concerns in a separate post

Oh, and I’m giving John a rare Worst Person In Austin award. Well done.

The FTA and last night

if you parse Langmore’s comments it makes me think he was asking them about cancelling the project now (rather than moving the middle third in 8 years); and Project Connect staff were vocal and public at the beginning of the process that Lamar/Guadalupe was on the table and that we should not act as if rapid bus precluded urban rail there.

They either lied then or they’re lying now. Personally, I believe they lied then in order to try to get more buy-in for this process (I myself believed Rapid Bus effectively precluded urban rail and was convinced to believe it might not by those staff members); but it could be now, too; the mixed messages last night about the FTA maybe considering Rapid Bus ‘permanent’ versus what the City Council eventually threw in as a fig leaf is just one obvious indicator.

The fact that the guy who ran the Rapid Bus project at Capital Metro came up and spoke in favor of Lamar and said he doesn’t buy the FTA argument should tell you something.

No sir, I don’t buy it.

No, the Riley fig leaf last night changes nothing – it does not commit to a fair evaluation of the Lamar/Guadalupe ROUTE against whatever is shat out for Highlandmall or Highlandmueller; and it does not force a real answer about the FTA’s opinion about moving Rapid Bus in 2020 or 2022 or whenever (instead of John Langmore’s claims that made it pretty clear he implied to them he wanted an opinion on cancelling it today, in 2013). Its only tangible effect would be an attempt to delay opposition until it’s too late.

I’m continuing to urge all transit advocates to vote AGAINST the bond referendum in 2014.

Citizen comment from 11/15/2013 CCAG

Summary of yesterday

Update: The video’s already up; you can see my speech here (click on Citizens Communications to jump to me).

I spoke in citizens’ communication yesterday to the CCAG. Gave up a half day to do so (had to be there to sign up at 1:15; limited slots; ended up getting there shortly after noon to make sure I got my spot). Found out as the meeting started that citizen communication is the LAST thing. Uh-oh.

My original speech was going to be about why Rapid Bus should not preclude rail in the Lamar ‘subcorridor’. Since I ended up giving my speech AFTER the ridiculous announcement that it’s going to be Highland ‘and ERC’; I ended up rewriting my speech into an indictment of the process, which has been gradually revealed to have been designed to generate the predestined conclusion that Mueller (i.e. Not Lamar) should be the initial route. (Note that Highland is, as I’m calling it, “Mueller in drag”; Kyle Keahy made sure to mention many times that it takes you right to the edge of Mueller).

Amazingly, Scott Gross had the gall to put up a slide showing an overwhelming citizen preference for Lamar over the next closest two alternatives; and then proceeded to argue it meant nothing; that their made-up or mangled data which led to misleading conclusions was somehow more valid than the opinion of the transiterati in this town. Well, he just implied that; they never went back and mentioned the overwhelming vote for Lamar again.

My thoughts on the reason for this choice largely mirror Chris Bradford, aka the Austin Contrarian, who made this excellent comment in response to Julio’s blog post:

I don’t agree with B-.

We all agree that ERC should be part of a fully built-out urban rail system. It is highly unlikely that it will be built first, though. The obstacles are just too high. Building another bridge over LBL is very tricky, and very expensive. Then they will have to lay a mile of track and get across I-35 just get to East Riverside’s western edge. Given that any initial starter line will (and should) connect downtown and UT, the next logical phase is to keep heading north. Heading across the lake and then down East Riverside for the first phase will require a really high initial bond amount, giving voters sticker shock.

If ERC isn’t a genuine first-phase option, then why was it named? I believe it is being dangled out there to prevent the Highland opponents from mobilizing for a fight. It will be pulled back as a true first-phase option at the last possible moment.

And we shouldn’t lose sight of this: Highland will be first. Going up to Highland Mall through UT’s eastern edge and Red River (or some route even further east) is a bad route. It’s a waste of money. And, yes, it will foreclose rail on Guadalupe/Lamar indefinitely. It will do so for a couple of reasons: (1) it will have relatively low ridership, which will dampen public support for further investments; and (2) although it is too far from Guad/Lamar to serve the dense neighborhoods on that route, it is too close to justify another investment on Guad/Lamar until other parts of town have been served.

I see their announcement of Highland/ERC as a cynical political strategy to dampen opposition until it’s too late. That deserves an “F,” not a B-.

If they put forward a plan to build ERC first, I’ll switch to B. But I don’t think that will happen.

WTB a new Cap Metro.

ERC is not going to be built in the first phase; this is the city staff being aware enough to group it with Highland so people will say “well, at least they hit SOME density (in ERC)”. It’s going to be Highland, which takes you right to the edge of Mueller, and then, oops, we’re right back to that predetermined conclusion that we should do exactly what the plan was in 2010.

These look so very very different.

These look so very very different. (Image courtesy @jacedeloney)

The meeting will go up soon on the city channel 6 site. I’m told I was viewed as “intense”.

Tried to make my 3 minutes at 3:00 count, but there was no reaction from the CCAG; except that afterwards I was cornered by a UT VP and lectured for not having provided them much data. Sorry, ma’am, I got a job and a family; it ought to be the job of the people you PAY TO DO THIS to provide honest data. Oh, and Dave Sullivan got mad because I didn’t mention the GPS stuff in Rapid Bus as an improvement. Dave, it was in the earlier draft. Trust me.

The Rapid Bus post will have to wait. The time I was going to spend at this chess tournament writing it up turned out to be burned up by running around after my 4 year old, although I did get to talk to Councilmember Spelman for ten minutes before Sophie insisted that enough was enough.

How do I feel? Despite popular conception, I’m apparently not completely cynical as I was surprised at how embarassingly shameless this con-job ended up being. Thrown for enough of a loop that I ended up throwing bile all over twitter last night of a caliber that the world hasn’t seen in many years. Worrying-the-coworkers level, here.

I’m most upset, though, I think, at the fact that the AURA people were conned by people like friend-of-the-blog JMVC into thinking that Rapid Bus did not, in fact, preclude urban rail. Those folks then proceeded to invest a huge amount of their time in this process, when the fix had been in since the very beginning; and they ended up giving Project Connect relevance and respect it didn’t deserve in the process. Had people been honest from the beginning, we might have been able to have an adult conversation about “why aren’t we doing more for Guadalupe than this shitty bus service that makes things worse for most people north of the river anyways?”. Now we never will. I wasted a couple of days of vacation time. The AURA executive committee spent ten times as much, each.

As for where we go from here? I will see what the AURA guys end up doing. If they continue to be suckered into believing, or even just acting like JMVC and his pals driving Project Connect are their friends rather than the obstacles they really are, then we’ll be parting ways. I said at the beginning of this process that if a non-Guadalupe route was recommended through an honest process using legitimate data and reasonable assumptions that I’d support it. THAT’S NOT EVEN CLOSE TO WHAT WE GOT.

And I don’t agree with Julio that we’ve made incredible progress. ‘We’ forced Project Connect to come up with bad data, bad analysis, and bad conclusions to justify their predetermined route, sure; but the route is still bad – it’s the same goddamn route as before – with the same 0% chance of being full-enough-of-riders to lead to a full system of urban rail instead of another RedLine-esque generation-losing one-and-done.

I definitely won’t be voting for a Highland/”ERC but really no just Mueller” alignment the way things stand now, nor should you.

It’s time to talk about Rapid Bus again.

So the PR machine is out in force trying to make Rapid Bus sound great so people are distracted from the fact that the densest, most active, most vibrant corridor in the city – not only now but 40 years from now – isn’t going to get rail until the 2040s, if then. In the meantime, we’re planning on building another hugely subsidized line to suburbs that don’t pay any Capital Metro taxes; and an urban rail line to a “new urban” development that is new, but isn’t urban; and even when fully built out will have far less people and far less travel demand to the core than Guadalupe/Lamar do today.

Was that sentence long enough? I pay by the period.

Anyways, so Rapid Bus? Snakes like JMVC are pitching the hell out of it and talking about it in the same breath as light rail and commuter rail as “high capacity transit” – which is a way to make people in Central Austin think they’re getting equal or nearly-equal quality.

This is bullshit.

So apparently I need to do this again – and this time, for the maximum possible fairness, I’m going to start with the BEST POSSIBLE CASE for Rapid Bus – the Burnet/Lamar corridor, where no express service currently exists.

Joker-here-we-go

A Really Crappy Chart For Your Monday

Since so many people either don’t get why the Red Line continues to be a problem or are disingenuously pretending not to know, I’m starting a flowchart for you. Thank me later. Click on the image below to get the full (part 1 only) chart.

If you want more, let me know.

Today’s news bits

I still have a post simmering about double-tracking the Red Line, and why it won’t make much difference; but I may have to update it after this morning’s news.
1. The freight train derailment. It’s happened several times before in the recent past – the tracks are pretty crappy in that part of town and have not been replaced. So is this the fault of the Red Line? Not directly; no. The tracks were bad before the Red Line was a gleam in Mike Krusee’s eye. HOWEVER: if we had built light rail in the 2000 plan (if Krusee hadn’t forced it to the polls early); we’d have two brand-new, presumably better-engineered and more safe tracks through the whole corridor – so a derailment would have been less likely.
2. MOPAC managed lanes. I say the same thing now that I said THREE YEARS AGO: If the lanes don’t have a dedicated exit or exits, and there’s no indication TXDOT has changed their plans to add any, they will be completely useless – they will quickly degrade to the speed of the general purpose lanes as people in the managed lane struggle to merge back through 3 lanes of traffic to get off the highway.

Just what you needed: Some Crappy Video

I shot this while watching the 8:12 arrival of the Red Line downtown this morning (on my way to work). Excuse the quality; my standard for a phone is “does it make calls? is it free?”.

I estimate 25-30 people got off the train here, which is a bit more than I expected given the MLK experience on Wednesday (same train; 15 people going to UT or Capitol). From this we can extrapolate that about 40-45 people get off at the two stops where you can get to actual workplaces on what I expect is the busiest trip of the morning (see end). Add in 5-15 more for all the other stops put together, and you get 45-60 people per day as a ceiling. (An aside: I overheard one passenger say “56 people” as she walked by; I don’t know whether that was a coincidence or maybe an actual passenger count).
Let’s be charitable and pretend that each and every one of the six morning trips carries that many people (even the ones starting up in Leander at 5:25 AM and 6:00 AM; even the one trip that starts at Howard and only had 2 people on it when I watched it arrive at MLK on Monday).

We’ve got a basic ceiling (charitable) estimate of 360 boardings in the morning by this method. IE, I would be greatly surprised if more than 720 boardings per day are now happening on weekdays on this line.
Meanwhile, Phoenix’s light rail line, built like our 2000 line would have been (except with less speed in suburban areas), has now passed 45,000 boardings per day.

This isn’t a ridership figure we can approach by running the Red Line more often and/or on two tracks. The reason Phoenix sees tens of thousands while we see hundreds is quite simply this: Phoenix made sure the train went where lots of people live and lots of people work (and even more go to school), rather than sticking a train on existing tracks that didn’t go near anything worthwhile. Phoenix did what we would have done in 2001 if Mike Krusee hadn’t forced us to the polls early, in other words; or what we should have come back to in 2004 instead of falling for commuter rail’s promise of “almost as good and a lot cheaper”.
This isn’t something we can fix by extending the Red Line to 4th/Brazos. You’re still stuck with a strategy that can never, ever, ever serve UT or the Capitol or the northern half of downtown (we will never run these DMU vehicles in front of UT or the Capitol – too stinky and too porky to make turns).

This is a dead end that we got because people trusted Capitol Metro rather than listening to those who have experience with another system just like this one.
(Why do I think this is likely the busiest trip of the morning? The trip after this one is the one that starts at Howard Lane and only had 2 people get off at MLK on Monday; the one after that doesn’t get downtown until 8:56, meaning most passengers to both UT and downtown would arrive after 9:00; and the trip before this one starts in Leander at 6:35 AM; the two before that are even more pervese – 6:00 and 5:25 AM respectively).

Blast From The Past

From The Chronicle in 2000:

The prevailing wisdom has been that a project in Smart-Grown Austin, serving major trip generators like UT and the Capitol complex, supported by Cap Met’s ample sales tax revenue, would be a slam dunk for a “highly recommended” rating. (Conversely, the original Red Line, which had far lower ridership and — even though it was on existing rail right of way — only marginally lower projected costs, was headed, Cap Met insiders say, for a “not recommended” kiss-of-death rating, which is why the transit authority switched tracks at the 11th hour.)

The differences between that “original Red Line” and the current Red Line that Krusee and Capital Metro forced on us in 2004 (now producing stunning ridership results for us) is that it would have had double tracks and electrification on its whole route (i.e., the Feds back in 2000 were telling Capital Metro that today’s Red Line AFTER adding a second track and electric wires would STILL produce disappointing ridership and that they wanted no part of funding it).
Guess what Capital Metro’s plans are to improve rail transit in Austin now?